
alternator 37300-03150 2614289 37300-03150 2614289 3730003150 3730004330, LRA03844, J5110553, 3730003150 J5110553 FOR Chrysler
Applicable models:Chrysler
Reference part number:37300-03150 2614289 37300-03150 2614289 3730003150 3730004330, LRA03844, J5110553, 3730003150 J5110553
| Rated output : | 12V 90A |
| Pulley : | |
| Size : | |
| Weight : | |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | Alternator |
| Specification : | 12V 90A |
| Pulley : | |
| Brand : | NUOJIN |
| Number : | 37300-03150 |
| Quality : | Remanufacture |
| Delivery time : | 30 days |



I. Preparation Work
Safety and Tools
Disconnect the negative terminal of the battery to prevent short circuits.
Prepare socket wrenches, torque wrenches, belt tensioner tools, rags, and dielectric grease (anti-corrosion).
Component Inspection
Verify that the model of the new generator matches the old one, confirm the 12V 90A specification is compatible, and check that the number of grooves on the pulley (commonly 4PK/6PK) is the same as the old one.
Clean oil stains and rust from the mounting bracket and bolt holes.
II. Installation Steps (Including Torque Parameters)
| Step | Operation Content | Key Torque |
|---|---|---|
| 1. Positioning and Installation | Place the generator into the bracket, align with the mounting holes, insert the upper and lower fixing bolts, and initially tighten by hand | — |
| 2. Tighten Bracket Bolts | Use a torque wrench to tighten the fixing bolts to ensure no deflection | 42 N·m (31 ft. lbs.) |
| 3. Electrical Connection | First connect the B+ cable (thick wire), then plug in the wiring harness connector, and apply dielectric grease to the terminals for anti-oxidation | Cable fixing nut: 15 N·m (11 ft. lbs.) |
| 4. Install Belt | Use a belt tensioner tool to loosen the belt, fit it onto the generator pulley, and ensure the belt meshes well with all grooves | — |
| 5. Adjust Belt Tension | Release the tensioner and check the belt tension: it should be possible to press down 10-15mm with the thumb | — |
| 6. Recheck and Power On | After checking that all bolts, connectors, and the belt are correct, connect the negative terminal of the battery | — |
III. Testing and Acceptance
Static Inspection:
Dynamic Testing
Start the engine; the battery voltage at idle should be 13.8-14.5V.
Turn on loads such as headlights and air conditioning; the voltage should remain above 13V without obvious fluctuations.
Listen for any abnormal noise from the generator and observe that the belt runs smoothly without jumping.
Key Precautions for Installing Chrysler 12V 90A Generator
I. Safety Operation
Priority to Power Disconnection
Prevention of Component Damage
When handling the generator, avoid gripping the terminals or pulley to prevent terminal deformation and bearing damage;
When installing the belt, do not use a screwdriver to pry the pulley for forced engagement into the grooves. Use a dedicated tensioner tool to loosen the belt tensioner, avoiding damage to the belt or generator bearings.
II. Installation Precision
Bolt Tightening Specifications
Tighten the fixing bracket bolts evenly to a torque of 42 N·m, pre-tighten first then final-tighten to prevent bracket deformation or bolt stripping;
Strictly control the torque of the B+ cable nut to 15 N·m: loose nuts may cause poor contact and overheating, while over-tightening may crack the terminal post.
Belt Installation Requirements
The belt must be fully seated in all pulley grooves (including crankshaft pulley, tensioner pulley, and generator pulley); improper seating can lead to slipping, insufficient power generation, or even belt detachment;
The belt tension should allow a 10-15mm deflection when pressed with the thumb at the midpoint between two pulleys. Excessive tension accelerates bearing wear, while insufficient tension causes slipping and abnormal noise.
Electrical Connection Details
Fully insert the wiring harness connector and engage the positioning clip to prevent loosening from vibration; apply dielectric grease to terminals to avoid oxidation and poor contact;
Install an insulating sleeve on the B+ cable to ensure no contact with metal components in the engine compartment, preventing short circuits.
III. Compatibility Check
Component Matching Verification
Cooling Direction Confirmation
IV. Testing and Acceptance
Step-by-Step Testing Principle
Static test: Before power-on, check that all bolts, connectors, and the belt are free of loosening or offset;
Dynamic test: After starting, measure the voltage at idle (13.8-14.5V), then retest with full loads (headlights, air conditioning, heater) – the voltage should remain above 13V without fluctuations or abnormal noise.
Abnormal Condition Handling
V. Post-Installation Maintenance Tips
References:

