
alternator,20024N,20024,437554,TG16C013,2543264,059-903-016-D,059-903-016-DX,0124525075A4,059-903-016D,0124525094,059903016D,2543264A,059-903-016DX,for Audi A4
Applicable models:Audi A4
Reference part number:20024N,20024,437554,TG16C013,2543264,059-903-016-D,059-903-016-DX,0124525075A4,059-903-016D,0124525094,059903016D,2543264A,059-903-016DX,059-903-023-B,059-903-023B
| Rated output : | 12V,180A,150A |
| Pulley : | 6PK |
| Size : | |
| Weight : | Net weight 6.6 |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | presale |
| Warranty : | 1 year |
| Product number : |
| Type : | Alternator |
| Specification : | 12V,180A,150A |
| Pulley : | 6PK |
| Brand : | nuojin |
| Number : | 059903016D |
| Quality : | renovate |
| Delivery time : | 30day |






Installation Method for 12V Generator (180A/150A Specifications) of Audi A4
I. Pre-installation Preparation
Safety Protection and Tools
Disconnect the negative cable of the battery and wait for at least 10 minutes (to discharge residual power from on-board capacitors and prevent short circuits).
Essential tools: Torque wrench (5–100 N·m), socket set (10/13/16 mm), flathead/Phillips screwdrivers, belt tension gauge, extension bars and universal joints.
Auxiliary tools: Engine compartment work light, cleaning cloth, medium-strength thread locker (meeting Audi original factory specifications).
Accessory Inspection
Verify the specifications of the new generator: 12V 150A/180A, ensuring the model matches the vehicle's VIN (to avoid electrical faults caused by power incompatibility).
Inspect generator accessories: Check that the mounting bracket, adjusting bolt, pulley and rectifier interface are free of deformation or damage; verify that the pins of the wiring harness connector are not oxidized.
II. Removal of the Old Generator (For Reverse Reference to Ensure Accurate Installation Alignment)
Remove the engine compartment trim panel to expose the generator and drive belt.
Use a belt tension gauge to measure the tension of the old belt and record the value (for tension calibration of the new belt).
Loosen the belt tensioner bolt and remove the drive belt.
Disconnect the power wiring harness (12V positive terminal; wrap the connector with insulating tape) and the signal wire connector (voltage regulator wiring harness) on the generator.
Unscrew the mounting bracket bolts and adjusting bolt of the generator in sequence, then take out the old generator.
III. Installation Steps for the New Generator
Pre-installation Positioning
Place the new generator into the mounting bracket position in the engine compartment, align the bolt holes, and initially screw on the mounting bracket bolts (do not fully tighten, leaving room for adjustment).
Install the adjusting bolt to ensure the generator can move slightly along the bracket slide rail (for subsequent belt tension adjustment).
Wiring Harness Connection
Connect the signal wire connector and ensure the buckle is fully locked (to prevent abnormal power generation caused by poor contact).
Connect the 12V positive power wiring harness, apply medium-strength thread locker to the bolt, and tighten it to original factory torque specifications (typically 25–30 N·m; refer to the vehicle service manual for details).
Drive Belt Installation and Tension Adjustment
Refer to the belt routing diagram (usually affixed to the inside of the engine compartment trim panel) to fit the new belt onto the generator pulley and other accessory pulleys (crankshaft pulley, tensioner pulley, idler pulley).
Pull the belt tensioner to tension the belt to the preset value:
Reference tension value for belts matched with 150A/180A generators: 80–100 N (refer to the vehicle manual for exact values).
If no tension gauge is available, press the middle section of the belt; a deflection of 10–15 mm is acceptable.
Tighten the generator mounting bracket bolts and adjusting bolt in accordance with original factory specifications (generally 40–45 N·m).
Recheck of Mounting Status
Ensure the belt is fully seated in the grooves of all pulleys without deviation or twisting.
Confirm that all bolts are tightened to the specified torque and the wiring harness is free of interference or damage.
IV. Post-installation Commissioning and Verification
Reconnect the negative cable of the battery and turn off all on-board electrical appliances.
Start the engine and let it idle for 5 minutes, observing the generator operation status:
No abnormal noise (such as belt slipping or bearing noise).
Use a multimeter to measure the battery terminal voltage: it should be 13.8–14.5 V at idle (normal power generation range); when high-power electrical appliances such as headlights and air conditioners are turned on, the voltage should not drop below 13.2 V.
Road test verification: Drive the vehicle for 20–30 km, check that the charging malfunction indicator light on the instrument panel does not illuminate, and the generator temperature does not rise abnormally.
Key Precautions for Installation of 12V 150A/180A Generator on Audi A4
Mandatory Requirements for Power-off Operation
Before installation, the negative cable of the battery must be disconnected and wait for at least 10 minutes to discharge the residual power of the vehicle-mounted electronic systems (such as ECU, capacitors). This prevents short circuits caused by wire harness grounding during installation, which could burn out the generator or vehicle-mounted electrical appliances.
It is prohibited to plug or unplug the generator signal wire connector or power wire harness without power-off, so as to avoid instantaneous voltage surges damaging the voltage regulator.
Torque Accuracy Control
Generator mounting bracket bolts and adjusting bolts: Tighten them to the original factory torque of the model (usually 40–45 N·m). Loose tightening will cause generator displacement and belt slipping; over-tightening will result in thread stripping or generator housing cracking.
Positive power wire harness fixing bolts: Apply medium-strength thread locker and control the torque within 25–30 N·m to prevent poor contact or sparking caused by bolt loosening during vehicle operation.
A torque wrench must be used for all torque operations; tightening by hand feel is strictly prohibited.
Drive Belt Tension Specifications
The tension of the drive belt matched with 150A/180A generators should be controlled within 80–100 N (subject to the vehicle manual). If no tension gauge is available, press the middle section of the belt (the position between two pulleys) — a deflection of 10–15 mm is acceptable.
Excessive tension: Accelerates the wear of generator bearings and water pump bearings, and shortens the service life of the belt. Insufficient tension: Causes belt slipping and abnormal noise, leads to insufficient power generation and battery depletion.
After installing the belt, confirm that it is fully seated in the grooves of all pulleys without deviation or twisting, so as to avoid belt detachment during operation.
Strict Prohibition of Specification Mixing
180A generators are suitable for high-equipped models (equipped with high-power electrical appliances such as seat heating, automatic air conditioners, and high-power audio systems), while 150A generators are suitable for basic-equipped models. The two types differ in voltage regulator parameters and pulley specifications and must not be interchanged arbitrarily.
When replacing the generator, check that the model matches the vehicle's VIN code to avoid ECU fault codes or damage to vehicle-mounted electrical appliances caused by power incompatibility.
Safety Requirements for Wire Harness Connection
The signal wire connector must be fully locked with the buckle in place, to prevent connector loosening due to vehicle vibration which could cause abnormal power generation (excessively high or low).
The positive power wire harness connector should be kept clean without oxidation or rust. A small amount of conductive paste can be applied before connection to improve conductivity. The wire harness should be routed away from high-temperature areas and moving parts of the engine to avoid abrasion and insulation damage.
Post-installation Verification Steps
Idle test: After starting the engine, let it run at idle speed for 5 minutes. Listen for no bearing noise or belt slipping noise, and check that the charging malfunction indicator light on the instrument panel does not illuminate.
Voltage detection: Use a multimeter to measure the battery terminal voltage. The normal range at idle speed is 13.8–14.5 V. When high-power electrical appliances such as headlights and air conditioners are turned on, the voltage should not be lower than 13.2 V. If not, re-adjust the belt tension or inspect the generator.
References:
Audi A4 Original Factory Service Manual (Core Reference)
Chapter Location: Group 27 - Generator and Voltage Regulator (Electrical Equipment; Rep. Gr.27; Generator). This chapter covers the core content including disassembly, installation, torque specifications, and belt tension parameters for 150A/180A 12V generators.
Applicable Models: Mainstream Audi A4 versions such as B8/B9. It clearly specifies the generator power compatibility requirements for different configuration models (basic/high-equipped). The 180A generator is suitable for high-equipped models with multiple electrical appliances, while the 150A generator is for basic-equipped models.
Source of Key Parameters: The torque values of generator mounting bolts (40–45 N·m), positive wiring harness bolts (25–30 N·m), and the standard belt tension (80–100 N) are all derived from this manual.
Audi After-Sales Technical Bulletins
Industry Universal Standards
The voltage verification standard for generators after installation (13.8–14.5 V at idle speed, not less than 13.2 V under high-power load) complies with the SAE J56 standard and general test specifications for automotive electrical systems.
The specifications for thread locker application (medium-strength) and belt tension testing methods (tension gauge measurement/deflection judgment) are referenced from the general technical manual of the automotive repair industry.

