
starter QDJ2608P,QDJ2608P,QDJ2608P QDJ2608P,QDJ2608P,QDJ2608P QDJ2608P,QDJ2608P,QDJ2608P QDJ2608P,QDJ2608P,QDJ2608P QDJ2608P,QDJ2608P,QDJ2608P FOR Perkins
Applicable models:Perkins
Reference part number:QDJ2608P
| Power horsepower : | 24V 5.5.KW |
| Number of feet : | |
| Size : | |
| Weight : | |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Presale |
| Warranty : | 1 year |
| Product number : |
| Type : | Starter Motor |
| Specification : | 24V 5.5.KW |
| Number of feet : | |
| Brand : | NUOJIN |
| Number : | QDJ2608P |
| Quality : | refurbish |
| Delivery time : | 30 days |



The installation method of the Perkins 24V starter varies depending on the engine model. The following are the general installation methods compiled based on the Perkins 1000 series and 2800 series workshop manuals: Installation method of Perkins 1000 series starter • Install the gasket (if necessary): Install the gasket to the specified position, ensuring that its locating lip fits the flywheel housing. • Install the starter: Use appropriate tools to install the starter onto the flywheel housing and tighten the fixing bolts.Connecting Cables: Connect the starter's cables to the corresponding terminals, ensuring a secure connection. If the engine's flywheel housing is oil-filled, the starter must be sealed before installation. Clean the flange surface of the starter and the surface of the flywheel housing, and apply a continuous bead of sealant with a diameter of 2.0mm (0.080in) on the starter's flange surface near the boss. • Connecting the Battery: Connect the positive and negative cables of the battery, ensuring a secure connection.Installation Method for Perkins 2800 Series StarterSupport the starter with a crane: Align the starter with the mounting holes on the flywheel housing, and use a crane to lift the starter to the appropriate position.Secure the starter: Fix the starter to the flywheel housing with three bolts and tighten the bolts.Connect the wiring harness: Connect the wiring harness assembly to the starter. If the engine's ground wire is connected to the starter, tighten the nut of the ground wire to the specified torque of 30.5±3.5N・m (22.5±2.5lbf・ft).Connect the battery: Connect the positive and negative cables of the battery to ensure a secure connection.
When installing the Perkins 24V starter motor, the following precautions should be noted: • Safe Operation: Before installation, ensure that the battery disconnect switch is turned to the off position to prevent electric shock or short circuit. After installation is completed, turn it back to the on position. • Marking and Recording: Before removing the starter motor, identify and mark the positions of all wire harnesses to ensure correct connection during installation, avoiding incorrect wiring that may cause the starter motor to fail to work properly or damage other components. • Bolt Fastening: When installing studs and nuts, they must be tightened to the specified torque. For example, the tightening torque for M10 studs is 18N・m, for M12 studs is 25N・m; the tightening torque for M10 nuts is 44N・m, and for M12 nuts is 78N・m.Sealing treatment: If the flywheel housing of the engine is of the oil-filled type, the starter motor must undergo sealing treatment before installation. Clean the flange surface of the starter motor and the surface of the flywheel housing, and apply a continuous bead of sealant with a diameter of 2.0mm on the flange surface of the starter motor near the boss. • Wiring connection: Correctly connect the wiring harness assembly to the starter motor and the solenoid valve, ensuring a secure connection to avoid looseness or poor contact that may affect the normal operation of the starter motor. • Component inspection: Before installation, check the starter motor for cracks, corrosion, or other damages on its appearance to ensure its structural integrity. Meanwhile, check the wear level of the brushes and whether the surface of the commutator is clean to confirm good contact.
References:The content you mentioned regarding the installation precautions for the Perkins 24V starter motor is mainly from the document "Perkins Engine Electric Starter Motor - Disassembly and Installation Methods" published by Hunan Impower Machinery Co., Ltd. This document details the disassembly and installation steps of the Perkins engine electric starter motor, which includes precautions such as turning the battery disconnect switch to the off position before installation, tightening the studs and nuts to the specified torque during installation, and turning the battery disconnect switch to the on position after installation.

