
Starter 5547580 M108R3718SE STG93534 for DCEC Cummins ISZ
Applicable models: DCEC Cummins ISZ
Reference part number:5547580 M108R3718SE STG93534 STG93534 M108R3718SE M108R3718SE-VPP 5547580 C5547580,72735877, 88214356, 0001241016,S9077, 0001261005 0 001 241 016, 0 001 261 005 EAA-123106, UD01988S, MS731, 910822, 0 001 261 006, DRS0822, 0001261006,255559, 5402.3708000-01 BOS0001261006, UD12992S, MS 249 19083046, S9119,
| Power horsepower : | 24V 8.5KW |
| Number of feet : | 12T |
| Size : | 24*12*16single unit inner box |
| Weight : | net weight:12.5KG gross weight:13KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | starter |
| Specification : | 24V 8.5KW |
| Number of feet : | 12T |
| Brand : | nuojin |
| Number : | 5547580 M108R3718SE |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





Installation Procedure for Dongfeng Cummins 24V Starter Motor
Application Prerequisites and Preparations
Vehicle Model and Positioning
Applicable to Dongfeng Cummins diesel engines (e.g., ISDe/ISLe series). The starter motor is mostly mounted on the side of the flywheel housing or at the junction of the engine and transmission.
The vehicle needs to be lifted, and the engine underguard as well as necessary interfering components must be removed to provide sufficient working space.
The number of bolts (2/3 pieces), torque values and terminal definitions vary with different engine models.
Safety and Working Environment
Ensure the engine is turned off and cooled down completely; engage the parking brake and park the vehicle on a level surface.
Wear insulating gloves and safety goggles; keep a fire extinguisher on standby.
Disconnect the main negative terminal of the battery and insulate it properly. It is strictly prohibited to plug/unplug connectors or tighten terminals with power on.
Tools and Consumables
Pre-installation Inspection
Verify that the part number, drive gear tooth count/keyway, plug and terminal specifications of the new starter match the original one.
Ensure the battery is fully charged (static voltage of 24V system ≥ 25.2V).
Inspect the flywheel ring gear for tooth chipping and the starter housing for cracks or deformation.
Replace the O-ring with a new one and apply lubricating grease to it.
Installation Steps (Power-off → Cleaning and Alignment → Preliminary Tightening → Wiring → Final Tightening → Power Restoration → Testing)
- Power-off and CleaningDisconnect and insulate the main negative terminal of the battery. Clean the starter mounting surface, flywheel housing flange and terminals to remove oil, rust and dust; polish severely rusted areas with fine sandpaper until metal luster appears if needed. Protect the surrounding wiring harnesses and oil pipes to avoid collision damage.
- Positioning and Preliminary TighteningPlace the starter motor into the mounting position, insert the fixing bolts (usually 2/3 flange bolts) and hand-tighten them to leave room for adjustment. Ensure the mounting surfaces fit closely and the gear alignment is smooth; forcible prying to align bolt holes is strictly prohibited. Use a feeler gauge to check the meshing clearance between the drive gear and flywheel ring gear (follow the manual values; general reference range: 1.0–4.0 mm).
- Electrical Connection (Low-current Circuits First, High-current Circuits Second to Prevent Short Circuits)Plug in the control wiring harness connector and confirm the clip is locked in place. Apply a small amount of conductive paste to the main power terminal (usually marked B+/30), and tighten the nut to the torque specified in the manual (common reference value for 24V heavy-duty terminals: 20–25 N·m; refer to the manual for exact data). Check the grounding connection and wiring harness routing: keep the harness at least 50 mm away from high-temperature components such as exhaust manifolds and turbo heat shields, as well as rotating parts like belts/idlers; secure the harness with original factory clamps. Reinstall the terminal insulating cover.
- Final Tightening and ReassemblyUse a torque wrench to tighten the starter fixing bolts crosswise and in stages according to the manual values (common references: M12 bolts approx. 80 N·m; some models approx. 137±7 N·m; always follow the manual strictly). Reinstall the underguard and interfering components, and double-check to ensure no tools or foreign objects are left behind.
- Power Restoration and TestingReconnect the main negative terminal of the battery and tighten it to the specified torque. Start the engine and observe whether the gear meshing is stable without abnormal noise. Measure voltages with a multimeter: voltage ≥ 22.5V during startup; generator charging voltage 27.0–28.5V at idle. Check the temperature of the starter housing and inspect for any fluid leakage.
Key Precautions for Installation of Dongfeng Cummins 24V Starter Motor
I. Critical Control Requirements for Mechanical Meshing
1. Precise Adjustment of Meshing Clearance
- The meshing clearance between the starter drive gear and the flywheel ring gear must strictly comply with Cummins original factory standards (reference values vary slightly by model, with a general range of 1.0–4.0 mm) and must be verified by actual measurement using a feeler gauge.
Excessively small clearance: It may cause gear jamming and accelerated wear during startup, directly leading to overheating and burnout of the solenoid switch coil.
Excessively large clearance: It will produce obvious "gear chattering" noise; long-term use will result in tooth chipping of the ring gear or drive gear, causing startup failure.
- If the clearance fails to meet the standard, it should be corrected by adding or removing original factory adjusting gaskets between the starter motor and the flywheel housing. The use of non-standard gaskets, thickened washers, or component grinding for adjustment is strictly prohibited.
2. Standard for Cleaning and Alignment of Mounting Surfaces
- Before installation, it is mandatory to thoroughly clean the oil stains, rust, dust, and sealant residues on the starter flange surface and the flywheel housing mating surface. For severely rusted areas, use fine sandpaper to polish until the metal luster is exposed, to avoid poor fit of the mounting surface caused by impurities, which may lead to eccentric gear wear or housing cracking due to uneven stress.
- When placing the starter into position, it should fit naturally. Forcible prying to align bolt holes is strictly prohibited to prevent housing deformation or offset of the gear meshing center line. After hand-tightening the fixing bolts, manually rotate the crankshaft to recheck the meshing state of the gear and ring gear, ensuring there is no jamming or one-sided contact.
References:
- The two documents you received earlier, namely Installation Method for Dongfeng Cummins 24V Starter Motor and Key Precautions, are practical guidelines compiled by me based on universal industry procedures, the typical layout of Dongfeng Cummins starters (mounted on the side of the flywheel housing or at the engine-transmission junction, secured with 2 or 3 bolts), and after-sales maintenance experience. They are not direct verbatim excerpts from any publicly published book or official service manual.
Source Explanation and Basis
- Structure and ProceduresThe sequence of Power-off → Cleaning and Alignment → Preliminary Tightening → Wiring → Final Tightening → Power Restoration → Testing is the universal industry standard for starter motor disassembly and installation. It aligns with the principle specified in the Cummins official service manual that "installation follows the reverse order of removal".
- Key Parameters (Reference Values)Specifications such as the 1.0–4.0 mm meshing clearance, terminal/bolt torque values, and 24V system voltage ranges are derived from common after-sales standards for Cummins 24V starter motors and maintenance experience with similar models. For precise data, always refer to the official service manual corresponding to the engine model/VIN.
- Safety Rules and ProhibitionsRequirements including power-off operation, prohibition of forced alignment by prying, connecting low-current circuits before high-current ones, and strict torque control are fundamental safety guidelines for the electrical and mechanical maintenance of heavy-duty diesel engines, applicable to the vast majority of commercial vehicle models.
- Model-specific Key PointsDetails such as the starter mounting position, removal and reinstallation of the engine underguard, and avoidance of the drive shaft in four-wheel-drive models are summarized based on the common chassis and powertrain layout of Dongfeng Cummins series such as ISDe/ISLe.
How to Obtain Official Sources
- If you require authoritative, factory-issued information, you can obtain it through the following methods:
Provide the engine model (e.g., ISDe 4.5/ISLe 6.7), model year, the last 8 digits of the VIN, or the engine serial number. I can then help you locate the corresponding chapter in the Cummins official service manual and provide precise values for bolt positions, torque, and meshing clearance.
Self-inquiry: Log in to the Cummins official after-sales system or purchase the official service manual (in print or electronic format) for the relevant model, then search for the section titled "Starter Motor".
Contact the after-sales department of an authorized Dongfeng Cummins service station, provide the vehicle VIN/engine serial number, and request to review or copy the relevant disassembly and installation pages.

