Starter STG92685 5263669 QDJ2717 M93R3014SE for Cummins
Applicable models:Cummins
Reference part number: STG92685 5263669 C5263669 M93R3014SE QDJ2717
| Power horsepower : | 24V 6.6KW |
| Number of feet : | 10T |
| Size : | 24*12*16single unit inner box |
| Weight : | net weight:10.6KG gross weight:11.1KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | starter |
| Specification : | 24V 6.6KW |
| Number of feet : | 10T |
| Brand : | nuojin |
| Number : | 5263669 |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





English Translation: Installation Method for 24V 6.6KW Cummins Starter
1. Pre-Installation Preparation
1.1 Tool and Accessory Preparation
1.2 Safety and Environmental Preparation
1.3 Cleaning the Mounting Surface
2. Core Installation Operations
2.1 Aligning and Placing the Starter
2.2 Tightening the Fixing Bolts
2.3 Assembling Key Internal Components (If the Starter Was Disassembled)
Apply a small amount of grease to friction parts such as bushings and armature journals.
Install the intermediate support plate, overrunning clutch, and retaining ring in sequence, and secure the shaft end lock ring.
Slide the shift fork into the fork sleeve of the overrunning clutch, then insert the rotor into the drive end cover and tighten the support plate screws.
Finally, install the brushes: grind the contact surface of insulated brushes (with sleeves) and insert them into the insulated brush holders.
2.4 Connecting Electrical Circuits
Use wires with a cross-sectional area of more than 50mm² to connect the positive terminal of the storage battery to the starter terminal.
Use wires with a cross-sectional area of no less than 2.5mm² to connect the solenoid switch to the starter relay.
Clean oxidation from the terminals before wiring, then tighten the nuts to ensure a secure connection. Minimize wire length to reduce resistance loss.
2.5 Installing the Solenoid Switch
3. Post-Installation Adjustment and Testing
3.1 Gap Adjustment
Use a feeler gauge to check the gap between the drive gear and limit ring; adjust by rotating the connecting rod if it does not meet specifications.
Push the armature fully home to ensure the gap between the drive gear and lock nut is 1.5–2.5mm.
Verify the distance between the starter gear end face and the engine ring gear end face is 4±1mm; adjust with the limit screw if necessary.
Toggle the drive gear to ensure smooth 360° rotation without jamming. If the armature axial gap is abnormal, adjust by adding or removing end cover gaskets.
3.2 Power-on Testing
The starter operates with sufficient power and no abnormal noise.
No intense sparks occur between the brushes and commutator.
No impact noise between the drive gear and flywheel ring gear.
If issues such as gear jamming or weak starting occur, immediately cut off power and inspect the wiring or gaps.
English Translation: Precautions for Installation of 24V 6.6KW Cummins Starter
I. Safety Operation Specifications
1. Mandatory Power-Off Protection Requirements
2. High-Voltage Circuit Safety
3. Work Environment Requirements
4. Tool Usage Specifications
II. Assembly Precision Control
1. Sealing and Flatness of the Mounting Surface
2. Bolt Tightening Standards
High-strength bolts of original factory specifications (usually M12×1.75, grade 8.8) must be used for fixing bolts; replacement with ordinary bolts is strictly prohibited. During tightening, the principle of "symmetrical step-by-step tightening" must be followed, and the specified torque must be gradually achieved in 3 steps (215N·m for cast iron flywheel housings, 180N·m for aluminum alloy flywheel housings) to prevent deformation of the mounting surface or loosening of bolts.
References:
English Translation: Sources of Reference
- Doc88 Chongqing Cummins Engine Maintenance ManualThis manual is one of the core reference bases. It clearly specifies numerous key parameters and installation requirements, such as the distance between the starter gear end face and the engine ring gear end face being 4±1 mm, the storage battery capacity ≥180Ah with a CCA rating of 1300A, the main circuit wire cross-sectional area exceeding 50 mm², and the connecting wire between the solenoid switch and the starter relay having a cross-sectional area of no less than 2.5 mm². All these parameters accurately match the core installation specifications in the previous answers.
- Adjustment and Testing of Diesel Generator Starter Motor After Disassembly and AssemblyThis technical article details operations such as the disassembly, reassembly, and gap adjustment of Cummins-related starters. Assembly details including applying grease to friction parts during starter reassembly, grinding the contact surface of brushes before installation and inserting them into insulated brush holders, checking the firmness of the armature after assembly, and the 1.5-2.5 mm gap between the drive gear and the lock nut are highly consistent with the content related to internal component assembly and gap adjustment in the previous answers.
- Disassembly Sequence and Detailed Steps for Diesel Engine StartersPublished by Chongqing Cummins Power, this article supplements precautions such as preparation of disassembly tools, parts cleaning methods, and avoiding tapping the starter. It also clarifies that the starter reassembly must be performed in the reverse order of disassembly. These contents have improved the key points related to safe operation and assembly processes in the previous answers.
- Disassembly, Inspection, and Installation of Cummins Engine Starter MotorsThe article mentions that the thickness of the spacer during installation must be consistent with that during disassembly. This detail has been incorporated into the precautions for aligning and placing the starter in the previous answers to avoid equipment damage caused by mismatched accessory specifications.