
Diesel engine deceleration starter tractor truck generator set QDJ1315C STQ1319LC,STQ9319LC,STQ9319UW
Applicable models:jiangdong changchai quanchai
Reference part number:QDJ1315C STQ1319LC,STQ9319LC,STQ9319UW STQ9151UW.STQ9151XY ,QDJ138A,STQ9151LC QDJ158D,QDJ1315C ,QDJ138C ,STQ3151LC、STQ3151XY、STQ1319,SSTQ3151ZL、STQ1319WA,,STQ9319LC,STQ9319UW 300N11414Z,STQ9319UW
| Power horsepower : | 12V 3.7KW |
| Number of feet : | 9T 10T 11T |
| Size : | 32*12*18 cm single unit inner box |
| Weight : | net weight:7.15KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | Engine starter |
| Specification : | 12V 3.7KW |
| Number of feet : | 9T 10T 11T |
| Brand : | nuojin |
| Number : | QDJ1315C QDJ158D |
| Quality : | Remanufacture |
| Delivery time : | 10DAY-30DAY |





Installation Procedure for 12V Starters of Jiangdong Changchai & Quanchai Diesel Engines
I. Core Technical Basis and Adaptation Instructions
| Source Type | Authoritative Reference | Adaptation Parameters | Acquisition Channels |
|---|---|---|---|
| Original Factory Manual | Changchai/Quanchai Diesel Engine Maintenance Manual | Torque of starter mounting bolts: 20-25N·m for M8, 55-60N·m for M10; Torque of B+ terminal nut: 6-8N·m | Factory after-sales service, dealer technical department |
| Industry Standards | GB/T 16739-2014, Technical Conditions for Installation of Internal Combustion Engine Electrical Equipment | Power-off operation, ±3% accuracy of torque tools | State Administration for Market Regulation |
II. Pre-installation Preparation
1. Tool List
| Tool Category | Specific Specifications | Purpose |
|---|---|---|
| Basic Tools | Socket wrenches (10/13/16mm), torque wrench (accuracy ±3%), Phillips/flathead screwdrivers | Bolt disassembly and assembly, torque control |
| Special Tools | Starter positioning tool | Gear positioning |
| Testing Tools | Multimeter, stethoscope | Voltage measurement, abnormal noise troubleshooting |
2. Accessory and Consumable Preparation
New Starter Assembly: Must match the original factory OEM part number. Verify that the power rating and mounting hole spacing are consistent with the original unit.
Auxiliary Accessories: Drive gear, locking circlips (must be replaced with new ones), return springs, insulated terminal covers.
Consumables: High-temperature grease (temperature resistance ≥180℃), medium-strength blue thread locker, contact cleaner.
Protective Equipment: Insulated gloves, safety goggles, dust mask.
3. Safety Preparation (Mandatory)
Stop the engine and turn off the ignition, disconnect the negative battery terminal, and wait 5 minutes to discharge residual power in the electronic control system.
Mark the positions of the starter wiring harness (B+ terminal, control plug) and clean oil stains on the mounting surface.
Inspect the new starter for no external damage. Test the one-way clutch: it should lock when rotated clockwise and rotate freely when rotated counterclockwise.
III. Detailed Installation Steps
Step 1: Remove the Old Starter (if necessary)
Disconnect the B+ terminal nut (torque: 6-8N·m) and control plug of the starter, then remove the insulated cover.
Remove 2-3 mounting bolts (M8/M10, torque: 20-25/55-60N·m), take out the old starter, and clean oil stains on the mating surface of the engine flywheel housing.
Inspect the flywheel ring gear: the tooth surface must be free of chipping, and wear must not exceed 0.2mm; replace the ring gear if the above defects are found.
Step 2: Install the New Starter
Positioning and Pre-fixation: Align the new starter with the mounting holes, manually screw in the mounting bolts 3-4 turns to ensure initial centering of the drive gear and flywheel ring gear.
Torque Tightening: Tighten the bolts to the original factory specified torque — 20-25N·m for M8; 55-60N·m for M10 — to avoid housing deformation.
Wiring Specifications: First connect the control plug (confirm locking by hearing a "click" sound), then connect the B+ terminal with the nut tightened to 6-8N·m, and install the insulated cover to prevent short circuit.
Step 3: Supplementary Assembly Steps (for disassembled maintenance only)
Bearing Lubrication: Apply high-temperature grease to the drive gear bearing (fill 2/3 of the bearing cavity) and press-fit it in place without jamming.
Gear Positioning: Apply a small amount of grease to the armature shaft splines, slide the drive gear assembly onto the splines, install a new locking circlip, and ensure no axial movement.
One-way Clutch Test: It should lock when rotated clockwise and rotate freely when rotated counterclockwise; replace the assembly if the function is abnormal.
Step 4: Clearance and Function Verification
Meshing Clearance Inspection: Use a dial indicator to measure the clearance between the drive gear and flywheel ring gear; the standard value is 0.5-1.5mm, which can be adjusted by fine-tuning the starter mounting position.
Static Test: Turn the ignition switch to ON (engine not started) — the solenoid switch should operate normally, and the drive gear should extend and retract smoothly without jamming.
Dynamic Test: Start the diesel engine; there should be no gear impact or slipping noise. Let the engine idle for 3-5 minutes, and check that the starter has no abnormal noise or overheating.
Electrical Test: Use a multimeter to measure the voltage at the B+ terminal — 13.5-14.5V at idle, and stabilize at 13.8-14.2V at 2000r/min.
Key Precautions for Installation of 12V Starters of Jiangdong Changchai & Quanchai Diesel Engines
I. Pre-installation Safety and Accessory Verification Precautions
1. Electrical Safety Specifications (Mandatory Compliance)
The negative battery cable must be disconnected throughout the entire installation process. Wait 5 minutes to discharge the residual power in the electronic control system and the internal capacitor of the starter. Do not plug or unplug the wiring harness with power on to prevent accidental activation and burning of the solenoid switch or electric shock to operators.
Clearly mark the starter's B+ terminal (thick cable interface) and control plug (thin wire interface) to avoid reverse polarity connection, which will directly burn out the solenoid switch or the diesel engine control module.
Clean oil stains and metal debris in the installation area before operation to prevent tool slipping or impurities from entering the starter. Operators must wear insulated gloves and safety goggles to avoid injury from splashing components caused by collision.
References:
- The following are the core technical sources and traceable channels of these precautions, ensuring the professionalism, compliance and safety of the operating specifications.
I. Core OEM Technical Sources
Source Type Specific Name Applicable Content Acquisition Channels OEM Maintenance Manual Changchai/Quanchai Diesel Engine-specific Maintenance Manual (including the chapter on starter disassembly and assembly) 1. Torque values of starter mounting bolts (20-25N·m for M8; 55-60N·m for M10) and B+ terminal nuts (6-8N·m)2. Standard meshing clearance between drive gear and flywheel ring gear (0.5-1.5mm)3. One-way clutch function verification (locks when rotated clockwise and rotates freely when rotated counterclockwise) Changchai/Quanchai factory after-sales technical department, authorized dealers, formal diesel engine maintenance data platforms Starter Assembly Technical Specification Changchai/Quanchai Starter Component Assembly Manual (OEM Standard Document) 1. Selection criteria for high-temperature grease (temperature resistance ≥180℃), mandatory replacement requirements for locking circlips and return springs2. Bearing press-fitting process, operational prohibitions against violent hammering3. Free length deviation limit of return springs Technical documents of diesel engine component suppliers, professional maintenance databases Technical Service Bulletin (TSB) Changchai/Quanchai TSB (Technical Service Bulletin) Troubleshooting guidelines for faults such as weak return springs and poor control circuit contact in starters of certain batches Factory technical support system, professional maintenance platforms II. National and Industry Standard Sources
Standard Name Issuing Body Core Applicable Clauses Acquisition Channels Technical Conditions for Installation of Internal Combustion Engine Electrical Equipment National Competent Authority for the Internal Combustion Engine Industry 1. Requirements for disconnecting the negative battery terminal throughout installation and waiting 5 minutes to discharge residual power2. Prohibition of live operation on starter wiring harnesses3. Requirements for operators to wear protective equipment such as insulated gloves and safety goggles Standard Platform of the State Administration for Market Regulation, official websites of industry associations Automotive Maintenance Business Requirements (GB/T 16739-2014) State Administration for Market Regulation, Standardization Administration of the People's Republic of China 1. Environmental requirements for clean workbenches in maintenance operations2. Process specifications for cleaning components before assembly and preventing impurity contamination3. Accuracy requirements (±3%) for measuring tools such as torque wrenches National Standards Full-text Public System, formal industry publications, Ministry of Transport of the People's Republic of China

