
Dongfeng Tianlong starter QDJ2618 QDJ2803C D5010508380 5010508380
Applicable models: Dongfeng
Reference part number:QDJ2618 QDJ2803C D5010508380 5010508380 M9T60471;5010508380;5010508330 6-QA-180 D5010508380 QDJ2618 M9T60472 QDJ2803C M009T60473 5001853713;M009T60471;86061 5001853713 5010306592 5010480196 5010508380 M009T60473 M009T61571 5010306592 5010480196
| Power horsepower : | 24V 8KW |
| Number of feet : | 11T |
| Size : | 44*24*19cm single unit inner box |
| Weight : | NET WEIGHT:10.4KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | Enginestarter |
| Specification : | 24V 8KW |
| Number of feet : | 11T |
| Brand : | NUO JIN |
| Number : | QDJ2618 QDJ2803C |
| Quality : | Renovate |
| Delivery time : | 10 days |





Installation Method for Dongfeng 24V Starter
Safety and Preparation (Mandatory)
Stop the engine, remove the key, disconnect the negative terminal of the battery and insulate it. For electronically controlled vehicles, wait a few minutes for discharge to prevent short circuit and ablation.
Verify the model, number of teeth and mounting holes. Prepare socket wrench, torque wrench, brush, cleaning agent, anti-seize compound/copper grease, insulating tape and multimeter.
Clean the mounting surface, ring gear and starter flange to remove oil stains and rust. Inspect the tooth surface of the ring gear and the drive gear of the starter, and grind or replace them if necessary.
Installation Steps (On-vehicle Assembly Installation)
Alignment and Positioning: Align the starter flange with the engine mounting surface, with the drive gear facing the ring gear to ensure no interference. Insert the positioning pin/guide sleeve, pass through the fixing bolts and tighten them by hand.
Bolt Fastening: Tighten the bolts diagonally and step by step according to the manufacturer's torque specification (common M10/M12 bolts with a torque of about 40–60 N·m, subject to the vehicle manual). Ensure that the gaskets/spring washers between the bolts and the flange are complete, and apply anti-seize compound if necessary.
Wiring Connection (Ignition Switch OFF): First connect the thick power cable (Terminal 30), add a lock washer and tighten it. Then connect the thin control cable (Terminal 50/plug) and ensure it is locked in place. Check the cleanliness and fastening of the grounding surface.
Power Restoration and Testing: Reconnect the negative terminal of the battery. First perform a no-load test (short-circuit Terminals 30 and 50; the starter should run smoothly without gear whine under 24V voltage). Then start the engine on the vehicle and observe smooth startup without slipping/abnormal noise, and ensure the gear returns to position normally after startup.
Key Points and Common Problems
| Key Points | Practices | Common Problems | Solutions |
|---|---|---|---|
| Power-off Sequence | Disconnect the negative terminal first, and reconnect it last during power restoration | Short circuit causing fuse/harness burnout | Cut off the power immediately and inspect the circuit and fuses |
| Torque Fastening | Tighten diagonally and step by step according to the manual value | Bolt thread stripping or flange deformation | Replace the bolts and retighten them according to the specified torque |
| Circuit Identification | The thick cable (Terminal 30) is connected to the positive terminal of the battery, and the thin cable (Terminal 50) is connected to the starting control circuit | Reverse connection leading to electromagnetic switch burnout | Verify the terminal markings and reconnect the wires correctly |
| Ring Gear Clearance | Ensure the clearance between the drive gear and the ring gear complies with specifications | Gear whine/slippage | Adjust the gaskets or replace the ring gear/drive gear |
| Good Grounding | Ensure the flange and engine body surface are clean and tight | Weak startup or failure to start | Grind the grounding surface and fasten the bolts securely |
Commissioning and Troubleshooting
No-load Test: The starter shall run smoothly without noise and with normal current under 24V voltage. If it fails to run, check the power supply, grounding, and the continuity of Terminals 30 and 50.
Startup Test: The starter should engage quickly, start powerfully and without slipping during ignition. If slipping occurs, inspect the clearance, tooth surface and overrunning clutch. If engagement fails, check the voltage of Terminal 50 and the electromagnetic switch.
Abnormal Handling: Overheating → Inspect grounding, load and coil; Abnormal noise → Inspect interference, tooth surface and bearings; Failure to return after startup → Inspect the shift fork, return spring and electromagnetic switch.
Precautions for Installation of Dongfeng 24V Starter
Electrical Safety
The negative terminal of the battery must be disconnected first throughout the installation process. For electronically controlled vehicles, wait 5–10 minutes for discharge to prevent circuit short circuits that could burn out the starter coil, fuses, or the entire vehicle wiring harness. When restoring power, reconnect the negative terminal last to avoid accidental grounding during operation.
The 24V system operates at a relatively high voltage. Do not directly touch the thick power terminal (Terminal 30) and thin control terminal (Terminal 50) of the starter with bare hands to prevent electric shock or short-circuit sparking.
Wiring connections must be clearly distinguished: the thick cable (Terminal 30) connects to the positive terminal of the battery, and the thin cable (Terminal 50) connects to the starting control circuit. Reverse connection is strictly prohibited, as it will directly burn out the electromagnetic switch.
Mechanical Assembly Specifications
Before installation, thoroughly clean the starter flange surface, engine mounting surface, and ring gear tooth surface to remove oil stains, rust, and impurities. If there is a gasket between the flange and the engine body, reinstall it in its original position; do not omit or misinstall it, otherwise the meshing clearance between the drive gear and the ring gear will be affected.
Tighten the fixing bolts diagonally and in stages, strictly following the torque specified by the manufacturer (typically 40–50 N·m for M10 bolts and 50–60 N·m for M12 bolts, subject to the vehicle manual). Avoid excessive force to prevent bolt thread stripping, flange deformation, or damage to the engine body threads.
Do not strike the starter housing or drive end cover violently during assembly. If the fit is too tight, use a dedicated puller or guide tool to avoid damaging the bearings, shift fork, or overrunning clutch.
For reassembly after disassembly: ensure the electromagnetic switch is properly connected to the shift fork and the return spring is securely installed; the contact area between the carbon brushes and the commutator shall not be less than 75%; the bearing clearance shall meet the standard. Apply a small amount of high-temperature resistant grease after assembly (avoid contaminating the commutator with oil).
Meshing Clearance Inspection
After installation, verify the meshing clearance between the drive gear and the ring gear (usually 0.5–1.5 mm, subject to the vehicle technical manual). Excessive clearance can cause meshing slippage, while insufficient clearance will result in gear whine.
If the clearance is not up to standard, adjust it by increasing or decreasing the adjusting gaskets between the starter flange and the engine mounting surface. Never force the bolts to tighten for reluctant assembly.
Test Operation Requirements
During the no-load test, the duration of short-circuiting Terminals 30 and 50 shall not exceed 5 seconds to prevent overheating and burnout of the starter coil. Ensure the starter is in a suspended state during the test, with the drive gear free from jamming, running smoothly and without abnormal noise.
Before conducting the on-vehicle startup test, inspect the wiring harness routing. Make sure the power cables and control cables are kept away from high-temperature engine components (e.g., exhaust pipes) and rotating parts (e.g., flywheels, pulleys). Secure the harness firmly with cable ties to prevent abrasion or scorching.
Observe the drive gear return condition after startup: at the moment the engine starts, the gear should quickly disengage from the ring gear and return to its original position. If the gear fails to retract after startup, turn off the engine and disconnect the power supply immediately, then troubleshoot the shift fork, return spring or electromagnetic switch for faults.
References:
Explanation and Source Tracing
The core logic and steps (Power-off → Cleaning and Alignment → Fastening → Wiring → Power Restoration → Testing) are the general installation procedures for starters, applicable to the vast majority of 24V commercial vehicle starters.
Parameters such as terminal definitions (30/50), torque ranges and ring gear clearances are common industry values, which shall be subject to the original factory maintenance manual of your vehicle model.

