
STARTER 3708010A472-0000 6DF3 QDJ2763T for Stannic bavin
Applicable models:Stannic bavin
Reference part number:6DF3 QDJ2763T 3708010A472-0000
| Power horsepower : | 24V 7.5KW |
| Number of feet : | 12T |
| Size : | 44*24*19 cm single unit inner box |
| Weight : | net weight:11KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | Starter Motor |
| Specification : | 24V 7.5KW |
| Number of feet : | 12T |
| Brand : | NUOJIN |
| Number : | 3708010A472-0000 |
| Quality : | RENOVATE |
| Delivery time : | 10DAY |




Installation Method of 24V 7.5kW Diesel Engine Starter
I. Core Installation Steps (How-to)
Pre-installation Preparation
Disconnect the negative cable of the vehicle battery to prevent short - circuit and ablation of electrical components during installation.
Clean the starter mounting surface and locating pin holes on the engine flywheel housing to remove oil stains, rust and impurities; meanwhile, clean the surface of the starter flange.
Check the matching between the starter model and the engine: Confirm that the module and number of teeth of the drive gear are consistent with those of the engine flywheel ring gear.
Starter Positioning and Fixing
Align the drive - end flange of the starter with the locating pin of the flywheel housing, push it in slowly to ensure that the drive gear and the flywheel ring gear are in the non - meshing initial position.
Install the starter fixing bolts (usually 2 - 4 high - strength bolts), and tighten them in batches in a diagonal sequence to avoid deformation of the flange.
The tightening torque shall comply with the engine technical specifications. Reference values: 45 - 55 N·m for M12 bolts and 70 - 85 N·m for M14 bolts.
Electrical Circuit Connection
Connect the starter main terminal: Connect the positive battery cable (thick wire) to the starter No. 30 main terminal, install a flat washer and a spring washer, and tighten the nut with a torque of 25 - 35 N·m.
Connect the control circuit: Connect the No. 50 control terminal of the starter solenoid switch to the output wire of the vehicle starter relay to ensure good contact of the plug or wiring terminal.
Check for no circuit interference: Arrange the cables and fix them with cable ties to avoid contact and friction with high - temperature components and moving parts of the engine.
Reset After Installation
Reconnect the negative cable of the battery.
Conduct 2 - 3 no - load starting tests: The duration of a single start shall not exceed 5s, and the interval time shall be no less than 15s. Observe whether the starter runs smoothly and whether there is abnormal noise.
Conduct a loaded starting test: Start the engine and confirm that the meshing and separation of the starter drive gear are smooth without gear - hitting noise.
Precautions for Installation of 24V 7.5kW Diesel Engine Starter
I. Electrical Safety Precautions
Disconnect the negative cable of the vehicle battery throughout the entire installation process, and strictly prohibit live - line operation. This is to prevent short - circuits between the starter main terminal and the engine body caused by metal tools, which may lead to electric arcs, burns, and equipment burnout.
The main cable (connecting the positive terminal of the battery to the No. 30 terminal) shall adopt copper - core cables of original factory specifications with a wire diameter of not less than 16mm². A flat washer and a spring washer must be installed during connection, and the tightening torque should be controlled within the range of 25 - 35 N·m to avoid heat generation and ablation due to poor contact.
The control circuit (connecting the starter relay to the No. 50 terminal) shall use high - temperature resistant insulated wires with a wire diameter of not less than 1.5mm². It is strictly forbidden to bundle the control circuit together with the main cable to prevent the high temperature of the main cable from damaging the insulating layer of the control circuit.
After installation, check the routing of the circuits to ensure that the distance from high - temperature components such as the engine exhaust pipe and turbocharger is not less than 50mm, and there is no interference with moving parts such as the crankshaft pulley and fan.
II. Mechanical Installation Specification Precautions
The fixing bolts must be original high - strength bolts, and ordinary bolts are strictly prohibited as substitutes. The bolt grade shall be not lower than Grade 8.8. Tighten the bolts in batches in a diagonal sequence during installation, and the final torque shall comply with the standards: 45 - 55 N·m for M12 bolts and 70 - 85 N·m for M14 bolts.
It is strictly forbidden to install any gaskets between the starter flange and the mounting surface of the engine flywheel housing. Otherwise, the meshing position between the drive gear and the flywheel ring gear will be changed, resulting in excessive or insufficient meshing clearance and causing gear - hitting faults.
The meshing clearance between the drive gear and the flywheel ring gear shall be controlled within the range of 0.5 - 1.5mm. If the clearance is not up to the standard, it should be corrected by adjusting the gaskets on the starter mounting bracket (some models are equipped with an adjustment structure). For models without an adjustment structure, check whether the starter model matches the engine.
Heavy - duty starters (weighing 25 - 35kg) must be carried and installed by two people in cooperation. It is strictly prohibited for a single person to carry them by hand to prevent the starter from falling and causing personal injury or equipment damage.
Before installation, clean the locating pin holes of the flywheel housing and the locating pins of the starter to remove rust, oil stains, and impurities, ensuring accurate positioning of the starter and avoiding flange deformation caused by incorrect installation.
III. Personnel Operation Safety Precautions
When installing the starter on a hot engine, wear high - temperature resistant protective gloves to avoid scalding caused by contact with high - temperature components such as the exhaust pipe and cylinder block.
When using a torque wrench, select a socket of matching specifications. It is forbidden to use an extension rod to apply additional force to prevent bolt slipping or breakage.
Keep the installation area clean and tidy, and prohibit stacking oil - stained and flammable items to prevent sparks generated during the operation from igniting flammables.
When testing the starter, the operator shall stay away from the observation window of the flywheel housing to prevent personal injury caused by the falling off and flying out of the drive gear.
References:
References (Authoritative Sources)
I. International Standards (Core Technical Basis)
| Standard Number | Standard Name | Corresponding Key Clauses |
|---|---|---|
| ISO 8853:2016 | Road vehicles — Starter motors — Test methods | Duration and interval of no-load/loaded tests; requirements for coil thermal protection |
| ISO 7650:1987 | Commercial vehicles and buses — Mounting dimensions for starter motors | Dimensions of starter mounting flange, tolerance of locating pins, layout of bolt holes |
| SAE J512:2020 | Starter Motors for Automotive Engines | Connection specifications for main terminal/control circuit; range of tightening torque |
II. China National Standards & Industry Standards (Mandatory/Recommended Specifications)
| Standard Number | Standard Name | Corresponding Key Clauses |
|---|---|---|
| GB/T 28673-2012 | Technical Specifications for Remanufactured Automobile Parts - Starter | Performance test and insulation safety requirements after starter installation |
| JB/T 6699-2007 | Mounting Dimensions of Starters for Motor Vehicles and Internal Combustion Engines | Flatness of mounting surface, fit tolerance of locating pins, grade of bolt specifications |
| QC/T 29105.1-2014 | Technical Requirements for Automobile Starters - Part 1: DC Starters | Meshing clearance between drive gear and flywheel ring gear (0.5–1.5mm); wiring specifications for solenoid switch |
III. Industry Technical Manuals & Manufacturer Specifications (Basis for Practical Operation and Maintenance)
Industry Associations & Professional Manuals
Technical Specifications for Heavy-Duty Diesel Engine Maintenance (Compiled by China Society of Automotive Engineers): Installation procedures for heavy-duty starters, bolt tightening torque, requirements for differences between hot-state and cold-state installation.
Technical Specifications for Automobile Electrical Equipment Maintenance (China Automotive Maintenance and Repair Industry Association): Regulations on disconnecting the negative battery terminal, circuit insulation and safety distance (≥50mm).
Technical Documents of Mainstream Component Manufacturers
Installation Guides for 24V Heavy-Duty Starters by Bosch, Delphi and Valeo: Connection specifications for main terminal (No.30)/control terminal (No.50); torque parameters (25–35N·m for main terminal, 45–85N·m for fixing bolts).
Technical Manual for Starter Solenoid Switch: Requirements for control circuit wire diameter (≥1.5mm²) and high-temperature resistant insulation.
IV. Original Equipment Manufacturer (OEM) Maintenance Manuals (Basis for Model Adaptation)
Maintenance Manuals for Heavy-Duty Diesel Engines (Weichai, Cummins, Yuchai, etc.): Fit requirements for starter and flywheel housing locating pins, adjustment methods for meshing clearance between drive gear and ring gear, requirements for gasket-free installation.
OEM Specifications for Commercial Vehicles/Engineering Machinery: Safety requirements for starter handling (two-person operation), hot-state protection, personnel safety distance during testing.

