
Starter Motor 47715266,82036365,84208918,87398251,87583927 11131279 11131279, 11131282, 11131526, 11131570 AZE4210, AZE4247, AZE4267, AZE4573 FOR deutz
Applicable models:deutz
Reference part number:47715266,82036365,84208918,87398251,87583927 11131279 0001223507 11131279, 11131282, 11131526, 11131570,11.131.526 11.131.921 11.131.971 11.132.144,AZE4210, AZE4247, AZE4267, AZE4573 11131921, AZE4123, AZE4139, AZE4194 504015749, 504388220 IS1189 MS24
| Power horsepower : | 12v 5.0KW |
| Number of feet : | 10T |
| Size : | |
| Weight : | 10.1KG |
| Packaging : | Neutral packaging |
| Spot/Pre sale : | Presale |
| Warranty : | 1 year |
| Product number : |
| Type : | Starter Motor |
| Specification : | 12v 5.0KW |
| Number of feet : | 10T |
| Brand : | NUOJIN |
| Number : | 47715266,82036365,84208918 |
| Quality : | refurbish |
| Delivery time : | 30 days |





Installation Method of Deutz 12V Starter
I. Pre-installation Preparation
Safety Protection
Turn off the ignition switch and disconnect the negative battery cable to prevent short circuits.
Tools and Accessories
Prepare socket wrenches, torque wrenches, wire brushes, cleaning agents, new gaskets (for some models), thread lockers, insulating tape, etc. Verify that the starter model is compatible with the Deutz engine.
Cleaning and Inspection
Clean oil stains, rust, and impurities from the engine flywheel housing mounting surface and the starter flange spigot to ensure a tight fit. Inspect the drive gear and flywheel ring gear for excessive wear or chipped teeth; replace them if necessary.
Removal of Old Starter (if applicable)
Disconnect the starter wiring harness plug and the main power cable nut, remove the mounting bolts, and take off the old starter smoothly while arranging the parts in order.
II. Step-by-step Installation Procedure
Positioning and Pre-fixing
Align the starter flange with the flywheel housing mounting holes, with the drive gear facing the flywheel ring gear. Insert the mounting bolts and pre-tighten them manually first to ensure the starter flange is fully attached to the engine mounting surface with no gaps.
Bolt Tightening
Tighten the bolts in a crisscross symmetrical sequence using a torque wrench. The reference torque for common Deutz specifications is 35–45 N·m (refer to the model-specific manual for exact values). Over-tightening is strictly prohibited to avoid thread damage or housing cracking.
Electrical Wiring Connection
First, connect the main power cable (thick wire) to the starter main terminal post, and tighten the nut to 20–25 N·m. Then, connect the excitation wire (thin wire, S terminal) and ensure the plug is fully engaged and secured without loosening. Arrange the wiring harness to avoid interference with moving parts.
Reassembly and Inspection
Install the protective cover (if equipped) and refit the removed components such as the lower guard plate. Reconnect the negative battery cable.
III. Key Commissioning and Testing
Clearance Inspection
The end clearance between the drive gear face and the flywheel ring gear face should be 2.5–5 mm. If the clearance is not up to standard, adjust it by adding or removing mounting gaskets. Calibrate the clearance between the shift fork and the drive mechanism according to the model requirements.
Functional Testing
Test the starter by turning the ignition key. Listen for smooth engagement without gear grinding noise, and confirm that the engine starts normally. Each continuous cranking should not exceed 5 seconds, with an interval of 10–15 seconds between attempts. If the engine fails to start after three attempts, troubleshooting is required.
Recheck
After stopping the engine, check for loose bolts, no wiring harness interference, and no overheating or abnormal odor at the terminal posts.
Key Precautions for Installing Deutz 12V Starter
- Prioritize Power-off OperationDisconnect the negative battery cable throughout the entire installation process to prevent short circuits, ablation of the starter solenoid switch, or damage to engine electronic control components caused by accidental contact with circuits. Reconnect the negative cable only after the installation is fully completed.
- Ensure Mounting Surface Fit with No GapsClean oil stains, rust, and sealant residues from the engine flywheel housing mounting surface and the starter flange spigot to achieve a full, tight fit between the two components. Some models require installation of original equipment manufacturer (OEM) gaskets—never add or remove gaskets without authorization. Unauthorized gasket modification can lead to poor meshing between the drive gear and flywheel ring gear, and cause stress cracking of the starter housing.
- Strictly Comply with Bolt Tightening Specifications
Pre-tighten the mounting bolts in a crisscross symmetrical sequence, then use a torque wrench to tighten them to the torque value specified for the specific model (standard range: 35–45 N·m; refer to the corresponding Deutz engine manual for exact figures). Never use an air impact wrench for forced tightening.
Apply a small amount of thread locker to the bolt threads to prevent loosening due to vibration. If a bolt hole becomes stripped, repair the thread or replace the mounting seat—do not attempt forced installation.
- Follow Standard Electrical Wiring Practices
Ensure the terminals of the main power cable (thick wire) are crimped flat and evenly; tighten the nuts to 20–25 N·m and install lock washers on the terminals to prevent overheating caused by loose connections. Route the cable away from high-temperature components (e.g., engine exhaust pipes) and moving parts (e.g., fans).
Fully engage the plug of the excitation control wire (thin wire, S terminal) to ensure a secure connection—reversing the excitation wire and main power cable will directly burn out the solenoid switch coil.
After completing the wiring, organize the harness and secure it with cable ties to prevent insulation wear caused by shaking during vehicle operation.
- Precisely Adjust Meshing ClearanceThe end clearance between the drive gear face and flywheel ring gear face must be controlled within the range of 2.5–5 mm. Excessively small clearance can cause gear jamming and failure to disengage, while excessively large clearance will result in gear grinding noise during meshing. Calibrate the clearance by adding or removing OEM adjustment gaskets, and ensure the gasket thickness matches the model requirements.
- Protect Components and Prohibit Improper Operations
Never strike the starter housing, drive gear, or solenoid switch, as this can damage internal coils, overrunning clutches, and brush assemblies.
Apply a small amount of high-temperature grease to the contact area between the starter spline shaft and shift fork. Keep the solenoid switch contacts clean and dry—do not add extra engine oil or grease.
- Adhere to Standard Testing Procedures
During the initial start-up test, limit each cranking cycle to no more than 5 seconds, with an interval of at least 10–15 seconds between consecutive attempts. If the engine fails to start after three attempts, stop testing and troubleshoot the fault—prolonged energization will burn out the starter.
Listen for smooth meshing with no grinding or sharp noises during start-up. After starting, check the starter terminals for overheating or burning odors.
- Verify Model CompatibilityBefore installation, confirm that the starter model is fully compatible with the Deutz engine model (e.g., BF4M2012, BF6M1013). Different engine models have varying starter mounting hole positions and gear modules—incorrect installation will lead to severe mechanical failures.
References:
| Content Module | Core Authoritative Sources | Supplementary Sources |
|---|---|---|
| Power-off for safety, mounting surface fitting, bolt torque requirements, electrical connection specifications | Deutz official engine workshop service manuals (e.g., manuals for models such as BF4M2012, BF6M1013) and special starter installation instructions (issued by DEUTZ AG) | Universal starter maintenance specifications (e.g., manuals from supporting manufacturers like Bosch and Delphi) |
| Drive gear-flywheel ring gear clearance (2.5–5 mm), shift fork adjustment | Deutz technical parameter table for flywheel housing-starter compatibility, original equipment manufacturer (OEM) installation drawings | Universal installation standards for internal combustion engine starters (e.g., relevant specifications in SAE J563) |
| Terminal post torque (20–25 N·m), bolt torque (35–45 N·m) | Deutz engine torque parameter manual, parts installation technical bulletins | Universal standards for electrical connection tightening in automotive electrical systems |
| Functional test specifications (cranking duration and interval), troubleshooting | Deutz Engine Operation and Maintenance Manual | Industry consensus on maintenance of diesel engine starting systems |
Supplementary Notes
- Examples of Official Manual NumbersDeutz TD/TCD 2012/2013 Series Installation Manual (Order-No. 0399 1969 en), BFM2012 Workshop Manual, etc. These documents are available via the official Deutz website or authorized dealers.
- Non-official SourcesThe content also integrates universal operating specifications for the diesel engine maintenance industry and technical experience in starter installation, to ensure comprehensive coverage of core risk points in actual operation scenarios.

