
Starter Motor 111257,111760,US857,323911,3604677,3604677PX 3926932x4935789.4944701,CST606000S.CST60600RS 9P901544, 0986023450,CST60600.CST60600AS FOR Mercedes Benz, Dove, Scania Cummins 4BT 6BT
Applicable models:Mercedes Benz, Dove, Scania Cummins 4BT 6BT
Reference part number:111257,111760,US857,323911,3604677,3604677PX 3926932x4935789.4944701,CST606000S.CST60600RS 9P901544, 0986023450,CST60600.CST60600AS 323911.3354458 3604677.3604677PX,3604677RX C3918377.C4935789,1516994R,707112,9011707112 10455500 10455502.10461283.10461465,10455502 0230002030,6582N,6592N,6839N,10455500 , 10461283 10461468 10461486 1113291 3604677RX,367520RX,3904057,3909914, IS1140 3918377,3918378,3926932,3926932R,104555 00 10455502,10461283,10461465,10461468,LES0202 6574 50-8421 9P901544 ST9005 ST9042 10479616 10479622 10479623.10479655 1113594 1998459 323825 323911 76192011 71440033 61924036 1911961 1912103
| Power horsepower : | 24v 4.5KW |
| Number of feet : | 10T |
| Size : | |
| Weight : | Net weight 7.75, gross weight 8.25 |
| Packaging : | Neutral packaging |
| Spot/Pre sale : | Presale |
| Warranty : | 1 year |
| Product number : |
| Type : | Starter Motor |
| Specification : | 24v 4.5KW |
| Number of feet : | 10T |
| Brand : | NUOJIN |
| Number : | 111257,111760,US857 |
| Quality : | refurbish |
| Delivery time : | 30 days |




Installation Procedure for Mercedes-Benz 24V Starter Motor
I. Pre-Installation Preparation and Safety Specifications
Safety Protection
Tools and Components
Cleaning and Pre-Inspection
Used Part Inspection
II. Core Installation Steps (Taking Mercedes-Benz Commercial Vehicles as an Example)
Positioning and Pre-Installation
Bolt Tightening Specifications
Electrical Connections
Wiring Harness Securing
Accessory Assembly
III. Commissioning and Functional Verification
Circuit Check
No-Load Test
Load Test
Troubleshooting
Core Precautions for Mercedes-Benz 24V Starter Motor Installation
I. Core Precautions for Safety and Pre-Installation
Electrical Safety
Component Compatibility and Pre-Inspection
Cleaning and Lubrication
References:
I. Core Authoritative Sources (Ranked by Priority)
| Source Type | Specific Documents/Systems | Covered Content | Verification Path |
|---|---|---|---|
| Mercedes-Benz Official Service Manuals | Mercedes-Benz Commercial/Heavy-Duty Vehicle Service Manuals (e.g., OM471/OM473 series, Actros/Atego chassis) | Installation torque, bolt specifications, flywheel ring gear inspection, lubrication standards, electrical connection sequence | StarTekInfo (Mercedes-Benz dealer technical platform) or printed official manuals, corresponding to the "Starter Motor Removal and Installation" chapter (e.g., WM 276019) |
| Mercedes-Benz Official Torque Specifications | 1001TW Fastening Torque and Assembly Diagrams | Torque values for M10/M12 bolts (35–45 N·m / 60–70 N·m), wiring terminal torque (8–12 N·m) | Official torque database; query by vehicle model/year required |
| Mercedes-Benz Technical Service Bulletins (TSB) | TSBs related to starter motor installation and electrical safety | High-voltage power-off procedures for hybrid models, adaptation learning steps for AMT models | Built-in documents in Mercedes-Benz DAS/Star Diagnosis or dealer technical systems |
| Industry Standards | General Specifications for Automotive Starter Motor Installation (e.g., SAE J563) | Safe power-off procedures, starting test standards (≤5 seconds per cycle, ≥15 seconds interval) | SAE (Society of Automotive Engineers) standard documents |
| Summarized Maintenance Practices | Hands-on Guidelines from Authorized Mercedes-Benz Service Stations | Key points for cleaning and lubrication, troubleshooting logic (e.g., correction of gear scraping/weak starting) | Practical technical experience from frontline maintenance, consistent with official standards |
II. Corresponding Notes for Key Content and Sources
Safety and Pre-installation: The power-off sequence, flywheel ring gear inspection, and lubrication restrictions are all derived from the "Preparation Work" chapter of Mercedes-Benz official service manuals. The high-voltage power-off procedures for hybrid models refer to the High-Voltage Safety Manual for Mercedes-Benz hybrid vehicles.
Installation Accuracy Control: The diagonal bolt tightening sequence, torque values, and the 0.5–1.5 mm gap between the overrunning clutch and ring gear correspond to the official 1001TW torque specifications and starter motor installation positioning requirements.
Electrical Connections: The priority of control wire connection and the 8–12 N·m torque for power terminals are specified in Mercedes-Benz electrical system installation standards and starter motor terminal technical requirements.
Commissioning and Troubleshooting: The no-load/load test standards and voltage thresholds (≥22.5 V at idle, ≥20 V during starting) are referenced from Mercedes-Benz starter motor performance test specifications and official diagnostic procedures.
Special Vehicle Adaptation: Additional steps for AMT/hybrid models are sourced from Mercedes-Benz TSBs and Star Diagnosis adaptation operation manuals.

