
Glossy Engine Starter Motor 059911023J 059911024H 0001125520 0001105609 059911024E
Applicable models:AUDI Q7
Reference part number:059911023J 059911024H 0001125520 0001105609 059911024E CST10421ES,059911024HX,059911024H, 17678N,STR2291,955604108X,95560410800, 059911024EX,059911024E,059911024C, 955604108X,95560410800,CST10421GS 059911024J,059911024HX,059911024H 33330R,17678N,STR2291,,33330R 059911024E,059911024C,059911023S, 059911024E 056911024J 059911023J 059911023S,059911023J,056911024J
| Power horsepower : | 12V 2.0KW |
| Number of feet : | 9T |
| Size : | 24*12*16single unit inner box |
| Weight : | net weight:3.95KG gross weight:4.15KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | starter |
| Specification : | 12V 2.0KW |
| Number of feet : | 9T |
| Brand : | nuojin |
| Number : | 059911024E 059911023J 059911024H |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





Audi Q7 12V Starter Installation Method (OEM Standard Version, Compatible with Mainstream Engines such as EA837/EA839)
I. Pre-installation Preparation (12V-specific)
1. Tools and Materials
Special Tools: 13–19mm socket wrench set, torque wrench (accuracy ±5%), Phillips/flathead screwdriver, wire crimping tool, insulating tape/heat shrink tubing, high-pressure air gun, ratchet wrench, engine underguard removal tool
Auxiliary Materials: OEM grade 8.8 or higher high-strength bolts (M10/M12; M12 is mainstream for Q7), flat washers, spring washers, conductive paste, medium-strength threadlocker (e.g., Loctite 243), grounding cable with cross-sectional area ≥25mm² (for backup)
Safety Precautions:
Disconnect the battery negative terminal only (12V single-battery system, no need to disconnect the positive terminal). Wait 2–3 minutes after power-off to discharge residual voltage in the starter solenoid (discharge time for 12V systems is shorter than that for 24V systems).
Wear gloves and safety goggles.
Remove the engine underguard, and clean oil, carbon deposits, and rust from the joint between the engine and transmission (starter mounting position) to ensure a flat, debris-free mating surface.
Mark the positions of the starter wiring harness connectors (main power B+, control S terminal, ground) to avoid reverse connection.
2. Core Compatibility Checks
Meshing Clearance: Manually push the drive gear; the clearance between the gear and the flywheel ring gear must be 1.5–3mm (Audi OEM standard; excessive clearance causes gear chipping, insufficient clearance leads to jamming).
Voltage Verification: 12V starters are for single-battery systems only. Connection to 24V systems is strictly prohibited.
Gear Matching: Ensure the drive gear tooth count/module matches that of the Q7 flywheel ring gear. Verify the OEM part number (e.g., 059 911 021 A, 059 911 023 C, etc.).
Visual Inspection: Check that the starter housing has no cracks, the solenoid has no ablation, the drive gear has no chipped teeth, and the one-way clutch retracts smoothly.
II. Installation Steps (Q7 12V-specific, Universal for 4M/4L Series)
1. Mounting Seat Preparation
2. Pre-installation and Centering
Hoist the starter to the mounting seat, align the 2 main mounting bolts (Q7 standard M12 bolts), and screw them in 2–3 turns without fully tightening.
Adjust the starter angle to ensure the drive gear axis is completely parallel to the flywheel ring gear axis.
Manually rotate the crankshaft (using a wrench on the crankshaft pulley) to verify smooth gear meshing without jamming or uneven wear, and confirm proper retraction of the drive gear.
Ensure there is no interference between the starter and surrounding components (exhaust pipe, steering linkages, wiring harness).
3. Bolt Tightening (Critical Torque, Audi OEM Standard)
Pre-tightening: 25–30N·m
Final Tightening: 45–50N·m (Audi Q7 4M/4L OEM standard torque)
4. Electrical Connections (12V Specifications, Reverse Connection Strictly Prohibited)
(1) Main Power Connection (B+/+ Terminal)
Connect the thick positive battery cable (≥35mm²) to the starter B+/+ main terminal.
Install flat washers and spring washers; tighten to a torque of 20–25N·m. Apply a uniform layer of conductive paste to the connector to prevent overheating and ablation.
Ensure no cable twisting or exposed connectors. Secure the cable with ties and keep it away from high-temperature components such as the exhaust pipe and turbocharger.
(2) Control Circuit Connection (S/50 Terminal)
Connect the thin wire from the ignition switch/start relay output to the solenoid S/50 auxiliary terminal.
Wrap the connector with insulating tape or heat shrink tubing. Secure the wiring firmly to avoid interference with the flywheel housing and drive shaft.
Verify the connector pin definitions and strictly avoid reverse connection (S terminal is for control signal, B+ is for main power).
(3) Ground Connection (Critical Step)
Confirm reliable grounding between the starter housing and the engine block/transmission housing (poor grounding in 12V systems can cause weak cranking and terminal ablation).
If the grounding resistance exceeds 0.5Ω, install a dedicated grounding cable with cross-sectional area ≥25mm². Connect one end to the starter housing ground stud and the other end to the engine block ground point; tighten to a torque of 15–20N·m.
III. Post-installation Commissioning (12V-specific)
1. Power Restoration
Reconnect the battery positive terminal first, then the negative terminal (12V single-battery connection sequence).
Inspect the area around the starter for no leftover tools or debris, ensure no cable pinching or abrasion, and confirm all connectors are fully seated.
2. No-load Test
Turn on the ignition switch and crank the starter for ≤3 seconds per cycle (12V starters draw high no-load current; prolonged cranking causes overheating).
Observe smooth starter operation without abnormal noise or smoke, and verify free extension and retraction of the drive gear.
3. Load Test
Start the engine and check for the absence of gear meshing noise. The drive gear must retract within 1 second after engine startup.
If cranking is weak, troubleshoot the following:
Loose/oxidized cable connectors
Insufficient cold battery static voltage (≥12.4V)
Poor grounding connection
Solenoid/one-way clutch malfunction
Flywheel ring gear wear
IV. Key Precautions (Audi Q7-specific)
- Power-off SpecificationsFor the 12V single-battery system, only disconnect the negative terminal—there is no need to disconnect the positive terminal. Live operation is strictly prohibited to prevent short circuits that could ablate the ECU.
- Torque Deviation Strictly ForbiddenThe final tightening torque for M12 bolts is 45–50N·m. Over-tightening can cause housing cracking, while under-tightening may lead to bolt loosening and gear chipping.
- Wiring Harness ProtectionThe temperature in the Q7 engine compartment is high. The main power cable must be kept away from the turbocharger and exhaust pipe to prevent insulation aging and short circuits.
- Gear Clearance RequirementThe 1.5–3mm clearance is the Audi OEM standard. Adjustment by hand feel is strictly prohibited; a feeler gauge must be used for measurement.
- Part Number Matching RuleStarter part numbers vary across different Q7 model years and engines (3.0T EA837, 3.0T EA839, 2.0T EA888). Cross-model usage is strictly forbidden.
- Test ProhibitionsNo-load cranking must not exceed 3 seconds per cycle, and the interval between consecutive cranking attempts must be ≥15 seconds to prevent starter burnout due to overheating.
References:
I. Core OEM Basis (Audi AG Official)
Core Manuals
《Audi Q7 4M Series Workshop Manual - Electrical System》 (Volume on Starter Installation/Removal/Commissioning)
Publisher: Audi AG (Audi Aktiengesellschaft)
Core Content: 12V starter installation torque (45–50N·m), meshing clearance (1.5–3mm), electrical connection specifications, grounding resistance requirements, and power-off operation procedures.
《Audi Q7 4L Series Service Manual - Engine Electrical System》
Publisher: Audi AG
Core Content: Starter mounting positions, bolt specifications, wiring harness protection, and troubleshooting standards for the older 4L generation Q7.
《Audi Technical Service Bulletin (TSB) 2018-05-03》 (Specifications for Starter Installation Torque and Clearance)
Publisher: Audi AG Technical Service Department
Core Content: A special technical bulletin for starter installation on EA837/EA839 engines, clearly defining anti-loosening measures, gear matching criteria, and test prohibitions.
《VW Group Standard VW 80000》 (General Specification for Starter Installation in Passenger Vehicles)
Publisher: Volkswagen Group
Core Content: Group-wide unified standards for starter installation torque, electrical safety, grounding, and anti-loosening, which are implemented across all Audi models.
Access Channels
Authorized Audi service centers/dealers (original paper/electronic service manuals)
Audi Tech Info Portal (https://techinfo.audi.com) – Audi’s official technical information platform (authorized account required)
Audi China official service website (https://www.audi.cn)

