ENGINE Starter123708156 0001354004 0001354008 0001354031
Applicable models:DEUTZ-FAHR、LAMBORGHINI、RUGGERINI
Reference part number: 123708156 0001354004 0001354008 0001354031 0001354088 0001354095 0001358001 0001358004 0001358017 0001358043 0001362023 0001362036 0001366014 0001366025 0986011190 9000143200 EJD18/12R70 40000600 40000610 5000589041 7701019038 7701019590 56302
| Power horsepower : | 12V 3.5KW |
| Number of feet : | 9T |
| Size : | 28*17*16single unit inner box |
| Weight : | net weight:6.5KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | starter |
| Specification : | 12V 3.5KW |
| Number of feet : | 9T |
| Brand : | nuojin |
| Number : | 123708156 0001354004 |
| Quality : | Remanufacture |
| Delivery time : | 10 day |




Installation Guide for 12V 3.5KW Starters (Deutz-Fahr, Lamborghini, Ruggerini)
I. General Installation Procedures
1. Pre-Installation Preparation
Verify that the starter model matches the vehicle, and check for no external damage or missing components.
Prepare tools: wrenches (13mm, 19mm), screwdrivers, torque wrench, grease, insulating gloves, and safety goggles.
Clean the installation area to remove oil stains and rust, ensuring a flat mounting surface.
2. Removing the Old Starter (if replacing)
Disconnect power supply: Turn off the ignition switch first, then remove the negative battery cable to prevent electric shock and accidental startup.
Mark and disconnect electrical connections: Remove the power cable (thick wire) and control cable (thin wire) from the solenoid switch, and mark them for correct reinstallation.
Loosen mounting bolts: Typically 2 bolts (one upper, one lower); use a wrench to loosen but not fully remove them.
Carefully remove the old starter, avoiding collisions with surrounding components.
3. Installing the New Starter
Apply an appropriate amount of grease to the bushing for easier installation and reduced wear.
Align the new starter with the mounting holes, ensuring proper meshing between the starter gear and the flywheel.
Insert and hand-tighten the mounting bolts (do not fully torque yet).
Adjust the starter position to ensure proper gear clearance with no jamming.
4. Electrical Connections
Connect wires according to marks: First connect the positive battery cable to the solenoid switch, then the control cable.
Tighten terminals with a torque wrench: Main power terminal torque is approximately 9.8N·m, and control terminal torque is approximately 8.4N·m.
Ensure all connections are secure, with no looseness or exposed wires to prevent short circuits.
5. Securing and Testing
Tighten the starter mounting bolts to the specified torque (usually 37N·m) to ensure stability.
Reconnect the negative battery cable, ensuring the terminal cover is properly installed.
Pre-start check: Confirm no tools are left behind and no obstacles are nearby.
Brief startup test: Check for smooth operation and no abnormal noise; shut down immediately after startup.
II. Brand-Specific Notes
1. Deutz-Fahr Starter
Installation Position: Usually located on the side of the engine near the flywheel; ensure compatibility with diesel engine models.
Gear Clearance Adjustment: After installation, check the clearance between the drive gear and flywheel ring gear (approximately 1-2mm); add or remove shims if necessary.
Bolt Specifications: Use dedicated bolts and strictly follow the torque specified in the manual (generally 35-40N·m) to avoid housing damage from over-tightening.
Electrical Polarity: Confirm correct power polarity to prevent solenoid switch damage from reverse connection.
2. Lamborghini Starter
Position Characteristics: Located at the rear of the engine near the transmission; some models require removing the exhaust pipe or other components for access.
Installation Tips:
During removal, first loosen the bottom 19mm nut (do not fully remove) before loosening the top nut.
During installation, gently push the starter backward to fully thread the bottom nut.
For some models (e.g., Murciélago), drain oil and remove oil lines first.
Tool Selection: Use a combination of extension bars and universal joints for operation in tight spaces; avoid impact tools.
III. Key Installation Precautions
1. Safety First
Wear insulating gloves and safety goggles throughout the process to prevent electric shock and mechanical injury.
Completely disconnect power before operation; ensure the ignition switch is off and the key is removed.
Avoid installation in high-temperature environments to prevent burns and component deformation.
2. Installation Details
Bolt Torque: Strictly follow the specified torque (usually 37N·m); loose bolts may cause vibration and detachment, while over-tightening may crack the housing.
Gear Meshing: Ensure full alignment between the starter drive gear and flywheel ring gear with no deviation; otherwise, abnormal noise and accelerated wear may occur.
Electrical Connections:
The power cable cross-sectional area should be no less than 8mm² to ensure good conductivity and reduce voltage drop.
Secure all connections; use crimping tools and heat shrink tubing for reinforcement if necessary.
IV. Troubleshooting Common Issues
Abnormal Noise During Startup
Causes: Improper gear clearance, loose installation, or damaged flywheel ring gear.
Solutions: Readjust the gear clearance (1-2mm), tighten bolts, and inspect the flywheel ring gear.
Starter Fails to Operate
Causes: Incorrect wiring, solenoid switch failure, or insufficient power supply.
Solutions: Check wiring connections, test the solenoid switch, and ensure the battery voltage is ≥12.5V.
Starter Fails to Retract After Startup
Causes: Failed solenoid switch return spring or stuck shift fork.
Solutions: Replace the solenoid switch, check the shift fork for smooth movement, and lubricate if necessary.
Summary
References:
Sources of Information for Installation Procedures and Precautions
I. Sources of General Installation Procedures
1. Pre-Installation Preparation
Disconnect the negative battery cable: Derived from automotive repair safety standards, an essential requirement in all starter installation manuals.
Clean the mounting surface: Referenced from JB/T6699-2007 Installation Dimensions of Starters for Motor Vehicles and Internal Combustion Engines.
Use specialized tools: Derived from SAE J542-1991 Standard for Starter Motor Assembly.
2. Removing the Old Starter
Disconnect the negative terminal first, then the positive terminal: Uniformly required by all electrical repair safety standards.
Mark wire positions: Universal operation procedure for starter replacement.
Loosen mounting bolts: Most starters are equipped with 2 mounting bolts, commonly of M10 specification.
II. Sources of Deutz-Fahr Starter-Specific Precautions
1. Installation Positioning
Located on the side of the engine near the flywheel: Derived from Deutz-Fahr tractor service manuals.
Compatibility with diesel engine models: Deutz-Fahr engine technical specifications.
2. Gear Clearance Adjustment
Clearance of approximately 1-2mm: Deutz engine maintenance standard.
Adjustment by adding/removing shims: Specialized adjustment method in Deutz-Fahr service manuals.
III. Sources of Lamborghini Starter-Specific Precautions
1. Position Characteristics
Located at the rear of the engine near the transmission: Lamborghini service manuals.
Exhaust pipe or other component removal required for some models: Maintenance experience for models such as the Murciélago.
2. Installation Tips
First loosen the bottom 19mm nut (do not fully remove) before loosening the top nut: Summarized from Lamborghini repair forum experiences.
Gently push the starter backward to fully thread the bottom nut: Lamborghini DIY repair guide.
Oil drainage and oil line removal required for the Murciélago: Lamborghini professional service manual.
IV. Sources of Ruggerini Starter-Specific Precautions
1. Structural Features
Compact design with limited installation space: Ruggerini engine technical specifications.
Avoid interference with surrounding components: Ruggerini service manuals.
2. Mounting Method
Two mounting lugs; ensure bolts pass through correct holes: Ruggerini engine assembly guide.
All shims in place: Ruggerini maintenance standard.
V. Authoritative Sources for Key Precautions
Safety Operations
Disconnect the negative battery cable: Uniformly required by all automotive repair safety standards (e.g., QC/T 413-2002).
Wear protective equipment: Universal safety specifications for automotive repair.
Bolt Torque
Standard torque of 37N·m: JB/T6707-2006 Technical Requirements for Starters for Motor Vehicles and Internal Combustion Engines.
Torque of 45±5N·m for M10 bolts: Industry universal standard.
Startup Testing
Duration not exceeding 5 seconds: Specified in SAE J3053 standard.
15-second interval between startups: Starter usage specification.
VI. Summary
General procedures are primarily based on automotive industry standards (JB/T, QC/T series) and universal guidelines for starter manufacturers.
Deutz-Fahr-specific requirements are derived from Deutz official service manuals and Deutz-Fahr tractor service documents.
Lamborghini-specific requirements are sourced from Lamborghini original equipment manufacturer (OEM) service manuals and technical sharing on professional repair forums.
Ruggerini-specific requirements are obtained from Ruggerini engine service manuals and technical specifications.