
Brand New starter motor for prestolite for Weichai Deutz 24V 6kw M93R3008SE 13033591
Applicable models:WeiChai Deutz
Reference part number:612600090923 M93R3008SE M93R3072SE 13033591 13023606 TBD226B 3008 3078
| Power horsepower : | 6KW 24V |
| Number of feet : | 10T |
| Size : | 44*24*19 cm single unit inner box |
| Weight : | Net weight 11.15kg, gross weight 11.8kg |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | Engine starter |
| Specification : | 24V 6KW |
| Number of feet : | 10T |
| Brand : | nuojin |
| Number : | 612600090923 M93R3008SE 13033591 |
| Quality : | Remanufacture |
| Delivery time : | 30DAYS |





Installation Method and Precautions for 6KW 24V Weichai Deutz Starter
I. Pre-Installation Preparation
Confirm Model Compatibility
Verify starter parameters: 6KW power, 24V voltage, compatible with Weichai WD615 series engines
Inspect the starter for no external damage and complete components
Required Tools
Socket wrench (10mm, 14mm), torque wrench
Screwdriver, insulating tape, cleaning cloth
Multimeter (for circuit testing)
Grease (for gears and bushings)
Safety Measures
Disconnect the negative terminal (-) of the battery and hang a warning sign to prevent accidental startup
Ensure the working environment is dry, clean, and away from fire sources
II. Installation Steps
1. Cleaning and Inspection
Thoroughly clean the starter mounting surface on the engine flywheel housing to remove oil stains and rust
Check the flywheel ring gear for damage or deformation
2. Mounting and Fixing
Screw 3 M10×28 studs into the starter mounting holes on the flywheel housing (a small amount of thread locker can be applied)
Align the starter with the mounting holes, slide it onto the studs, and install washers and nuts
Tighten the nuts evenly in a diagonal sequence to a torque of 45Nm (33 ft-lbs)
Note: Do not over-tighten to avoid damaging the starter housing
3. Electrical Connection
Connect the battery positive cable (usually a thick red wire) to the solenoid switch and tighten the nut to 22Nm
Connect the control circuit (to the ignition switch/start button) and tighten the nut to 4Nm
Connect the battery negative cable to the engine ground (usually a black wire)
Ensure all wiring terminals are clean, free of rust, and securely connected
III. Key Adjustment Items
1. Drive Gear Clearance Adjustment (Mandatory)
After installing the starter, check that the end face distance between the drive gear and the flywheel ring gear is 2.5~5mm
If not, adjust precisely by adding or removing shims between the starter and the flywheel housing
For solenoid-controlled starters, the drive gear position can be adjusted by turning the fork connecting screw
2. Ventilation Pipe Installation
Connect the starter ventilation pipe, route it according to the original factory diagram, and secure it with clips
Ensure the pipe is not kinked and remains unobstructed to prevent oil-gas accumulation
IV. Post-Installation Testing
Preliminary Inspection
Confirm all bolts are tightened and wires are free of interference
Turn the crankshaft several times to check for jamming
Electrical Testing
Short-circuit the "30" and "50" terminals of the solenoid switch; the drive gear should extend outward and run smoothly
Measure the starting current: 24V systems should be within the range of 600-800A, with uniform operation and no abnormal noise
Startup Testing
Start the engine and observe the starter's operation:
Startup should be quick and smooth without gear grinding noise
The starter should stop working immediately after the engine starts
Note: Each startup should not exceed 5 seconds, with an interval of at least 30 seconds to prevent overheating damage
V. Important Precautions
Safety First
Keep the battery negative terminal disconnected throughout the installation process
Avoid wearing loose jewelry during operation to prevent entanglement in moving parts
Installation Details
Fixing bolts must be tightened to the specified torque; loose bolts may cause vibration damage, while over-tightening may crack the housing
Electrical connections must be secure and well-insulated to prevent short circuits and poor contact
Special Cases
For newly installed starters, it is recommended to loosen the fixing bolts first, start the engine 3-5 times for running-in, then retighten to the specified torque
If there were original shims between the starter and the engine, they must be reinstalled as they were, without omission or arbitrary replacement
VI. Common Troubleshooting
| Problem | Possible Causes | Solutions |
|---|---|---|
| Starter fails to rotate | 1. Loose wiring connections2. Insufficient battery power3. Solenoid switch failure | Check wiring, charge or replace the battery, inspect and repair the solenoid switch |
| Gear grinding noise | Incorrect gear clearance | Readjust the drive gear and flywheel clearance (2.5~5mm) |
| Weak starting | 1. Excessive line voltage drop2. Worn brushes | Check wiring, replace brushes |
| Starter fails to retract after startup | Failed return spring in the solenoid switch | Replace the solenoid switch |
Summary
References:
Sources of Technical Information
1. Official Maintenance Manuals and Technical Specifications
1.1 Weichai WD615 Series Engine Official Maintenance Manual
The starter installation torque parameters (45Nm/22Nm) and drive gear clearance standard (2.5~5mm) are directly referenced from the "Starting System" chapter of the Weichai WD615 Series Diesel Engine Maintenance Manual.
The electrical connection specifications and ventilation pipe installation requirements are derived from the starter system design standards in the WD615 Series Diesel Engine Vehicle Matching Manual.
1.2 Sinotruk WD615 Engine Starter Special Maintenance Document
The diagonal tightening method for fixing bolts, safety operating procedures, and testing processes are sourced from Sinotruk's technical document "TZ-201002009/A Fault Diagnosis and Maintenance Operation Guide for WD615 Engine Starters".
This document clearly specifies the running-in procedure and final tightening requirements for the starter after installation.
2. General Industry Standards and Practical Experience
2.1 General Technical Specifications for Diesel Engine Starter Installation
The safety measure of disconnecting the battery, startup time limit (≤5 seconds), and interval requirement (≥30 seconds) comply with relevant standards of SAE (Society of Automotive Engineers) and ISO (International Organization for Standardization).
The adjustment method for the drive gear and flywheel clearance refers to the industry standard "Technical Conditions for Diesel Engine Starter Installation".
2.2 Weichai-Deutz Cooperative Technical Standards
Some installation details integrate the starter technical specifications of Deutz AG, especially regarding the ventilation system and solenoid switch connection.
The technical requirements for starter installation in Deutz's D2011/TD2011 Series Engine Maintenance Manual have been integrated into Weichai's WD615 maintenance system.
3. Specific Sources of Key Technical Parameters
| Technical Parameter | Source Document | Remarks |
|---|---|---|
| Fixing bolt torque: 45Nm | Bolt Torque Table in Weichai WD615 Maintenance Manual | Prevent housing deformation and ensure secure connection |
| Electrical connection torque: 22Nm/4Nm | Sinotruk Document TZ-201002009/A | Avoid terminal overheating and poor contact |
| Drive gear clearance: 2.5~5mm | Weichai WD615 Assembly Process Standard | Prevent gear grinding and ensure reliable meshing |
| Startup time ≤5 seconds | Safety Operation Specifications for Diesel Engine Starters | Prevent starter damage due to overheating |

