
alternator 27060-31030 104210-4060 20132914RC 2040419 27060-31030 CAL40419RS 270600P180 2706031060 2706031062 270603106284 2706031033 2706031240 27060-31052 for Runner, Corolla, Saab, Crown Sedan
Applicable models:Runner, Corolla, Saab, Crown Sedan
Reference part number:104210-4060 20132914RC 2040419 27060-31030 CAL40419RS 270600P180 2706031060 2706031062 270603106284 2706031033 2706031240 27060-31052 2706031060 2706031062 270603106284 2706031030 2706031031 2706031032 27060-311212, 27060-31211, 104210-1300 104210-1310 27060-31090 27060-31091 27060-31051 1042102150 1042102151 1042102080 1042104740 2706031090 2706031091 104210-2150, 104210-2151, 104210-4060, 27060-31050 1042104061
| Power horsepower : | 12V 130A |
| Number of feet : | 7PK |
| Size : | |
| Weight : | Net weight 5.9KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | presale |
| Warranty : | 1 year |
| Product number : |
| Type : | alternator |
| Specification : | 12V 130A |
| Number of feet : | 7PK |
| Brand : | NUOJIN |
| Number : | 27060-31030 |
| Quality : | remanufacturing |
| Delivery time : | 30 days |






Standard Installation Method for 12V Generators of 4Runner, Corolla, Saab, and Crown
General Pre-installation Preparations
Safety & Power-off Operation
Park the vehicle on level ground, engage the parking brake, and turn off the engine. Disconnect the negative cable of the storage battery and wear insulating gloves to prevent short circuits.
Tools & Materials
Tools: Socket wrench, torque wrench (precision ±3%), belt tensioner, multimeter, wiring harness clamp.
Materials: Original equipment manufacturer (OEM) bolts, lock washers, insulating tape, thread locking adhesive, same-model drive belt (if necessary).
Accessory Inspection
Check that the generator housing has no cracks, terminals are free of corrosion, and the rotor rotates flexibly without jamming or abnormal noise. Confirm that the generator model matches the engine, and the overrunning alternator pulley (if equipped) functions properly.
Model-specific Installation Steps & Torque Specifications
1. Toyota 4Runner
Generator Body Installation
Place the generator into the mounting bracket, insert the pivot and adjusting bolts, and manually tighten them for positioning. Use a torque wrench to tighten the pivot bolt to 49.0–63.7 N·m; leave allowance for initial tightening of the adjusting bolt.
Electrical Connection
Connect the power cable to the B+ terminal, put on the insulating sleeve, add a lock washer, and tighten to 18.6–24.5 N·m. Connect the D+ control wire to the corresponding terminal and tighten to 5 N·m. Verify that the housing is reliably grounded.
Belt Installation & Tensioning
Fit the belt into the pulley grooves without distortion. Use a belt tensioner to adjust the tension: press the midpoint of the longest belt span with your thumb, and the deflection should be 12–15 mm, or follow the manufacturer’s frequency data (100–120 Hz). Tighten the adjusting bolt to lock the position.
Power Restoration & Testing
Reconnect the negative battery cable, turn the ignition switch to the ON position, and check the charging indicator light. After starting the engine, the idle voltage should be 13.5–14.7 V and remain stable without fluctuation at 2000 rpm.
2. Toyota Corolla
Body Fixation
Place the generator into the mounting position, insert two fixing bolts, and manually tighten them for positioning. Tighten the M12 bolt to 25 N·m and the M14 bolt to 54 N·m.
Electrical Connection
Tighten the B+ terminal nut to 9.8 N·m and cover the dust cap. Insert and lock the wiring harness connector securely, then fasten the wiring harness clip.
Belt Installation & Tensioning
Confirm the belt model matches the original vehicle and fit it into the pulley grooves. Adjust the tension with a belt tensioner until the deflection reaches 12–15 mm under thumb pressure, then lock the tensioner.
Testing
Follow the general testing procedure; the idle voltage should be 13.5–14.7 V with no abnormal noise.
3. Saab (Taking 9-3/9-5 as Examples)
Body Installation
Mount the generator on the accessory bracket and tighten the two fixing bolts to 23–27 N·m.
Electrical Connection
Insert the wiring harness connector firmly and tighten the wiring harness fixing bolt to 7–10 N·m. Tighten the B+ terminal to 18.6–24.5 N·m and ensure proper insulation.
Belt Installation
Fit the belt onto the pulleys according to the specified routing, adjust the tension to the manufacturer’s requirements with a tensioner, and lock the tensioner.
Cooling System Reset (For Some Models)
Connect the water pump hose, fill the system with coolant, bleed air from the system, and install the lower guard plate.
4. Toyota Crown
Body Installation
Place the generator into the mounting position, insert three fixing bolts, and manually tighten them for positioning. Tighten the bolts diagonally to 49.0–63.7 N·m to avoid bracket deformation.
Electrical Connection
Tighten the B+ terminal to 18.6–24.5 N·m and the D+ terminal to 5 N·m. Insert the connector securely and check the grounding connection.
Belt Installation & Tensioning
Follow the general specifications; the belt deflection should be 12–15 mm or adjusted to the specified frequency. For some V6 models, disassembly and assembly can be performed through the upper space without removing the water pipe.
Testing
Follow the general testing procedure; the idle voltage should be 13.5–14.7 V and remain stable at 2000 rpm.
General Key Points for Electrical Connection & Belt Installation
| Item | Operation Specification | Torque Requirement |
|---|---|---|
| B+ Power Cable | Insulating sleeve + lock washer, no loose connection | 18.6–24.5 N·m |
| D+ Control Wire | Secure and firm, waterproof | 5 N·m |
| Grounding | Reliable contact between housing and engine block; install a dedicated grounding wire if contact is poor | - |
| Belt Tensioning | Deflection of 12–15 mm or frequency of 100–120 Hz | - |
Power Restoration, Testing & Trial Operation
Power Restoration Check
Reconnect the negative battery cable, turn the ignition switch to the ON position, and check that the charging indicator light turns on with no abnormal noise. After starting the engine, the indicator light should turn off with no abnormal noise.
Voltage Testing
The idle voltage should be 13.5–14.7 V and remain stable at 2000 rpm. For 48V mild hybrid models, use a diagnostic tool to complete generator-ECU matching.
30-minute On-load Trial Operation
Check for abnormal noise, peculiar smell, and abnormal housing heating (normal temperature ≤ 60℃), and ensure no belt slipping. Stop the engine immediately for troubleshooting if any abnormality is detected.
General Installation Precautions for 12V Generators of 4Runner, Corolla, Saab and Crown
Principle of Power-off Operation
Disconnect the negative cable of the vehicle battery before installation. Live operation is prohibited throughout the process to prevent circuit short circuits that could burn the generator’s excitation windings, rectifier or vehicle electrical components.
Before power restoration and testing, recheck the terminal positions and wiring harness models of all connections to ensure correctness, so as to avoid electrical faults such as generator failure to generate electricity, excessive or insufficient voltage caused by incorrect wiring.
For models equipped with a 48V mild hybrid system, in addition to disconnecting the 12V battery, it is necessary to disconnect the high-voltage components in accordance with the requirements of the maintenance manual and take proper insulation protection measures to prevent the risk of high-voltage electric shock.
Mechanical Assembly Specifications
Use original factory lock washers matching the fixing bolts, and tighten the bolts according to the torque specified for each model (49.0–63.7 N·m for 4Runner/Crown; 25 N·m for 12mm bolts and 54 N·m for 14mm bolts for Corolla; 23–27 N·m for Saab). Over-tightening is prohibited to prevent bracket deformation or thread slipping; under-tightening is also prohibited to avoid abnormal noise, vibration and bearing wear during operation.
The joint surface between the generator and the engine shall be clean and free of oil stains and impurities. Replace new seals if necessary to ensure tight fit without gaps and prevent engine oil from leaking into the generator interior and causing short circuits.
References:
- This document is based on official manufacturer technical documents, supplemented by industry standards and supporting manufacturer specifications, to ensure information traceability and operational compliance.
I. Core Sources (Priority Reference)
- Official Toyota Technical Documents (4Runner, Corolla, Crown)
Toyota 4Runner Engine Maintenance Manual: Specifies core parameters such as generator fixing bolt torque (49.0–63.7 N·m), B+ terminal torque (18.6–24.5 N·m), and D+ terminal torque (5 N·m); standardizes assembly requirements including belt tension, joint surface sealing, and power-off operation.
Toyota Corolla Engine Maintenance Manual: Stipulates the torque of 12mm fixing bolts (25 N·m) and 14mm fixing bolts (54 N·m), as well as the torque of B+ terminal nuts (9.8 N·m); clarifies operational specifications for electrical connection and belt installation.
Toyota Crown Engine Maintenance Manual: Specifies that generator fixing bolts should be tightened diagonally to 49.0–63.7 N·m; standardizes installation processes such as grounding inspection and belt tensioning.
Toyota Vehicle Electrical System Assembly Standards: Defines vehicle-level power-off procedures, wiring harness routing, and grounding specifications, including high-voltage component disconnection steps for 48V mild hybrid models.
- Official Saab Technical Documents
Saab 9-3/9-5 Maintenance Guide: Specifies generator fixing bolt torque (23–27 N·m); clarifies requirements for wiring harness fixation, cooling system pipeline connection specifications, and trial operation inspection key points.
- Generator Supporting Manufacturers (e.g., Bosch, Valeo)
12V Generator Installation and Maintenance Manual: Provides special guidelines for terminal identification (differentiation between B+ and D+), insulation protection, and rotor inspection; specifies risk consequences of incorrect wiring.
II. Supplementary References (Supplementary Verification)
Industry General Standards
SAE J1455 Electrical System Installation Specifications for Road Vehicles: Specifies general requirements for wiring torque, insulation class, and anti-loosening measures, supporting the specifications for electrical wiring and short-circuit prevention operations.
GB/T 13035 Technical Requirements for Automobile Generators: Stipulates post-installation generator performance (e.g., charging voltage 13.5–14.7 V) and acceptance criteria, guiding the testing and operation inspection process.

