
starter 6RB2 6RQ1 6PD 6A1 0230006091,023000-6091 ,1811000340, 1811000370 for isuzu
Applicable models: Isuzu 6RB2 6RQ1 6PD 6A1
Reference part number:CST20607AS,91251067,1811000440.1811000960 S210108、S210108A、S210108N、S21062、S21525S2525 1811000961.1811001270.1811001770.1811001800 1811001801,1811001861.1811002041.1811002170 1811002171.1811002172.1811002520.1811002521 1811002681,1811002740.1811002741.1811002742 STH3730EC、STH3730SK、STK3730WD.STK8730WD.STK9730WD STW8730LP、STW8730WD STH3730RB、STH3730WA,STW3730RB, STW3730WA 0230006040.0230006090.0230006091.0230006102 0230006103.0230007040.0230007041.0230008070 0230008074,0210001730,PA510049 2-3237-2W,18057N,19937N
| Power horsepower : | 24v 7.5KW |
| Number of feet : | 11t |
| Size : | 44*24*19single unit inner box |
| Weight : | net weight:15.8KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | ENGINE STARTER |
| Specification : | 24v 7.5KW |
| Number of feet : | 11t |
| Brand : | NUOJIN |
| Number : | 0230006091 |
| Quality : | Remanufacture |
| Delivery time : | 30 DAYS |





Isuzu 6RB2/6RQ1/6PD/6A1 Starter Installation Guide
I. Pre-Installation Preparation
1. Confirm Model Compatibility
2. Tool Preparation
Socket wrench set (10-14mm)
Torque wrench (0-50N·m)
Insulated gloves
Cleaning cloth
Grease
3. Safety Measures
Turn off the ignition switch.
Disconnect the negative battery terminal (black wire) and wait 5 minutes to prevent accidental startup.
Ensure the work area is well-ventilated and away from ignition sources.
II. Installation Steps
1. Clean the Mounting Surface
2. Install the Starter Body
Align the starter with the engine's mounting holes, ensuring the drive gear is properly engaged with the flywheel ring gear.
Insert the 2 fixing bolts and hand-tighten them initially.
Use a torque wrench to tighten the bolts alternately in stages to the specified torque (37-40N·m).
3. Electrical Connections
| Terminal | Connection | Precautions |
|---|---|---|
| B (or 30) | Positive battery terminal (red wire) | Secure with a nut to 9.8N·m torque. |
| S (or 50) | Ignition switch start position / Starter relay | Ensure reliable contact. |
| M (or C) | Starter motor winding | Typically connected to Terminal B. |
After connection, ensure wiring harnesses are free of interference and do not contact moving parts.
Install terminal protection covers to prevent short circuits.
4. Adjust Gear Clearance (Critical Step)
Turn off the ignition switch and disconnect the negative battery terminal.
Loosen the starter fixing bolts with a wrench.
Add or remove shims (0.5-1mm thickness) between the starter and engine mounting surface for fine adjustment.
Retighten the bolts and remeasure until the clearance meets the standard.
III. Important Precautions
1. Safe Operation
Strictly prohibited: Operating the starter while the engine is running (will damage gears).
Limit each startup attempt to no more than 5 seconds. If the engine fails to start, wait 10-15 seconds before retrying to prevent overheating damage.
Ensure dust covers and gaskets are properly installed after fitting to prevent dust ingress.
2. Installation Details
The contact surface between the starter and engine must be clean and paint-free to ensure good grounding.
Tighten bolts to the specified torque (37-40N·m): loose bolts cause vibration; over-tightening may damage the housing.
After installation, check for abnormal noise or vibration during starter operation.
3. Startup Test
Reconnect the battery terminals (positive first, then negative) after installation.
Briefly start the engine and observe the starter’s performance; release the key immediately after startup.
Verify the starter gear retracts smoothly without jamming.
IV. Maintenance Recommendations
Regularly inspect starter fixing bolts for looseness, especially after driving on rough terrain.
Check gear clearance every 500 hours or 6 months and adjust if necessary.
Keep wiring terminals clean and free of corrosion to ensure reliable contact.
In low-temperature environments, preheat the engine (if equipped with a preheater) before starting to reduce starter load.
Summary
References:
Sources of Technical Information
1. Isuzu Official Service Manuals
Isuzu 6RB2/6RQ1/6PD/6A1 Engine Service Manual – Original factory technical specifications, including starter installation torque (37-40N·m), electrical connection standards, and gear clearance (2.5-5mm) requirements.
Isuzu Universal Starter Installation Guide – General installation procedures for 24V system starters, emphasizing power-off safety operations and grounding requirements.
2. Professional Automotive Repair Materials
Automotive Starter Repair Technical Specifications – Industry standard document specifying safety operation requirements: maximum 5 seconds per startup attempt, minimum 10-15 seconds interval between attempts.
Heavy-Duty Diesel Vehicle Starter Installation Manual – Professional guide for commercial vehicle 24V systems, including terminal connection torque (9.8N·m) standards.
3. Component Manufacturer Technical Documents
Fuzhou Yida Electric Drive (Starter Manufacturer) Technical Manual – Confirms 24V 7.5KW starter compatibility with the 6RB2/6RQ1/6PD/6A1 engine series.
Nippon Denso / Hitachi (Isuzu Starter Suppliers) Installation Instructions – Detailed methods for adjusting drive gear and flywheel clearance.
4. Professional Automotive Repair Platform Resources
Autohome Technical Q&A – Provides power-off sequence before starter removal and safety operation key points to prevent impact damage.
Pacific Auto Repair Encyclopedia – Detailed description of starter mounting location (junction of engine and transmission) and fixing methods.
Dongchedi Repair Guide – Illustrated starter working principle and post-installation test procedures.
Key Technical Parameters & Sources
| Parameter | Source |
|---|---|
| Startup time ≤ 5 seconds, interval ≥ 10 seconds | Automotive repair industry standards |
| Mounting bolt torque: 37-40N·m | Isuzu official service manual |
| Electrical terminal torque: 9.8N·m | Starter manufacturer specifications |
| Gear clearance: 2.5-5mm | Isuzu original factory technical requirements |
| 24V 7.5KW specification confirmation | Fuzhou Yida Electric Drive product catalog |

