
Starter Motor JBH-S2310 SM-74019 SM74019 31200-55A-Z01 3120055AZ01 85114099 for Honda Accord 2.4 Fit City BR-V Jazz 1.5L
Applicable models:Honda Accord 2.4 Fit City BR-V Jazz 1.5L
Reference part number:SM-74019 31200-55A-Z01 SM74019 3120055AZ01 312005A2A52 L15Z1/L12B4 3120055AZ02 312005A2A51 312005A2A01 SM74019 SM740-19 3120055AZ02 SM74019 SM740-19 31200-55AZ02
| Power horsepower : | 12V 1.6KW |
| Number of feet : | 9T |
| Size : | 24*12*16single unit inner box |
| Weight : | net weight:2.6KG gross weight:2.7KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | STARTER ARMATURE |
| Specification : | 12V 1.6KW |
| Number of feet : | 9T |
| Brand : | NUOJIN |
| Number : | SM-74019 |
| Quality : | Remanufacture |
| Delivery time : | 7--10DAY |





The installation steps of the 12V starter motor for Honda Fit and Fengfan are basically the same, with the core being power disconnection safety, accurate positioning, correct wiring, and proper tightening. The following is a simplified process:
Step Operation Content Precautions
1. Preparation Turn off the engine and pull up the handbrake, disconnect the negative terminal of the battery Prevent electric shock and short circuit
2. Position Open the engine compartment and find the starter position (usually at the connection between the engine and transmission) Remove protective panels/decorative pieces if necessary
3. Remove old parts First remove the positive terminal wire of the electromagnetic switch, then unplug the control plug, and finally loosen 2-4 fixing bolts Hold with hand to prevent falling
4. Clean Clean the installation surface and threaded holes Ensure good adhesion
5. Install new parts Align with the positioning hole, pre-tighten the bolts, and tighten according to the specified torque Thread can be coated with anti-loosening agent
6. Wiring Connect the positive terminal wire of the electromagnetic switch first, then plug in the control plug Ensure firm and no looseness
7. Reinstall Restore protective panels/decorative pieces
8. Power on test Connect the negative terminal of the battery, briefly start to check operation and abnormal noise If abnormalities are found, immediately disconnect the power for inspection
Key points
• ⚡ Safety first: Keep power off throughout, especially prevent short circuit between positive and negative terminals when wiring.
•

