
starter 23300-F4211 23300F4211 is suitable for Nissan
Applicable models:Nissan
Reference part number: 23300-F4211 23300F4211
| Power horsepower : | 12V 0.8KW |
| Number of feet : | 8T M2T 2E长轴 |
| Size : | 24*18*17single unit inner box |
| Weight : | Net weight 3.65kg |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | ENGINE STARTER |
| Specification : | 12V 0.8KW |
| Number of feet : | 8T M2T 2E长轴 |
| Brand : | NUOJIN |
| Number : | 23300-F4211 |
| Quality : | Remanufacture |
| Delivery time : | 30DAYS |






Installation Method for Nissan 12V 0.8KW Starter
I. Pre-installation Preparation (Safety and Component Verification)
1. Safety Protection and Tool Preparation
Power-off Operation: Turn off the vehicle/equipment key switch and disconnect the negative battery cable (to prevent short circuit or accidental starter activation); wear insulating protective gloves.
Tool List: Socket wrench (matching bolt specifications), torque wrench (precision ±1N·m), metal cleaner/rust remover, new bolts/washers (prefer Nissan original parts), insulating tape, high-temperature resistant cable ties.
2. Component Compatibility Check
Starter Verification: Confirm the starter model is 12V 0.8KW, matching the Nissan engine model (e.g., ZD30, KA24, etc.) and the number of teeth on the flywheel ring gear; check for no housing cracks, terminal oxidation, and smooth telescoping of the electromagnetic switch manual push rod.
Flywheel Ring Gear Inspection: Clean oil stains on the flywheel ring gear surface, check for no broken teeth or excessive wear (tooth thickness wear ≤0.5mm); replace the flywheel ring gear if necessary.
Old Part Removal Marking: Mark the positions of wiring harness terminals (B+ main power terminal, S electromagnetic switch control terminal) and take photos of the wiring for reference; first remove the B+ terminal nut (do not damage the wiring harness insulation), then pull out the S terminal plug, finally remove the starter fixing bolts and take out the old starter.
3. Mounting Surface Cleaning
Thoroughly clean oil stains, rust, and residual sealant from the starter mounting surface on the engine block/transmission; sand the mounting surface to a metallic finish. Repair any grooved deformation before assembly.
Check that the positioning pins (if equipped) are not loose or damaged to ensure precise starter positioning after assembly.
II. Core Installation Steps (Precise Assembly Key Points)
1. Starter Positioning and Fixing
Align the new starter with the mounting holes, insert the fixing bolts (most Nissan models use M10×1.25 规格) and manually pre-tighten 2-3 turns (to avoid thread misalignment).
Tighten the bolts in a diagonal sequence with a torque wrench: the standard torque for M10 bolts is 45±5N·m (subject to Nissan original maintenance manual). Never use an extended wrench for forced tightening to prevent housing deformation or thread stripping.
2. Circuit Connection (Sequence Cannot Be Reversed)
Main Power Connection: Connect the positive battery wiring harness to the B+ terminal, install a flat washer + spring washer, tighten the nut to 12±2N·m, and add an insulating protective cover (to prevent short circuit).
Control Circuit Connection: Insert the ignition switch control wiring harness plug into the S terminal, ensuring the claw is locked in place (pull the plug lightly to confirm no detachment). For terminal-type wiring harnesses, crimp firmly with a crimping tool and wrap with insulating tape.
Wiring Harness Arrangement: Organize the wiring harness to avoid high-temperature/moving parts such as the flywheel, exhaust pipe, and cooling fan; secure with high-temperature resistant cable ties, leaving 5-10mm of harness slack (to prevent vibration-induced pulling).
3. Gap Check (Adjustment Required for Some Nissan Models)
Drive Gear and Flywheel Gap: Manually push the electromagnetic switch push rod to extend the drive gear; check that the gap between the gear and the flywheel ring gear end face is 2-4mm. Adjust by adding/removing mounting washers if the gap is incorrect.
Armature Shaft Axial Gap: Rotate the starter armature shaft; the axial play should be ≤0.5mm. Excessive gap causes gear meshing noise — replace the bearing or adjust washers if needed.
4. Reset and Power-on Preparation
Reinstall the wiring harness bracket and heat shield (if equipped). After confirming all components are properly assembled, connect the negative battery cable (tighten the terminal nut to 10-15N·m).
III. Post-installation Testing and Acceptance
1. No-load Test
Turn the key switch to the "START" position; single start duration ≤5 seconds, interval between two starts ≥10 seconds (to prevent coil overheating). Normal start performance:
Clear drive gear meshing without "tooth hitting" or "jamming" noise;
Smooth starter operation without abnormal vibration or whistling;
Drive gear retracts quickly when the key is released.
2. Load Test
Start the engine and observe that the starter drives the engine smoothly without drag. After starting, touch the B+ terminal — temperature rise ≤40℃ (slightly warm is normal; hot to the touch indicates poor wiring contact or insufficient wire diameter).
Start continuously 3-5 times to verify starter stability. If weak starting occurs, check the battery voltage (≥12.4V), wiring harness voltage drop (≤0.5V), or internal starter faults.
3. Detailed Re-inspection
Check that the wiring harness is not crushed or worn and the fixing points are secure;
Confirm good starter housing grounding (use a multimeter to test continuity between the housing and negative battery terminal, resistance ≤0.1Ω);
Clean residual tools and debris from the installation area and recheck the fixing bolt torque.
Core Precautions for Installation of Nissan 12V 0.8KW Starter
I. Safety Operation Category
1. Power-off Protection Must Be a Priority
2. Prevention of Mechanical Injury and Component Damage
The meshing area between the starter drive gear and flywheel ring gear is unprotected; keep hands away from the flywheel housing opening during installation, and clear surrounding tools and debris before testing start-up to prevent entanglement in moving parts.
Do not strike the starter housing with metal tools (easy to crack the internal armature winding and damage the brush holder); if positioning jams occur, check the flatness of the mounting surface instead of prying violently.
Wear insulating protective gloves to avoid bolt dropping due to oil slipping, or poor contact caused by metal scratches on terminals.
3. Fire and Explosion Prevention Specifications
II. Installation Accuracy Category
1. Mounting Surface and Positioning Requirements
The mounting surface of the engine/transmission must be thoroughly cleaned, free of oil, rust, and residual sealant; it can be wiped with metal cleaner and air-dried. If there are positioning pins, they must be reinstalled in their original positions (loss will cause starter deflection and abnormal gear meshing).
Gaskets must be assembled according to original factory specifications (thickened/thinned gaskets will change gear meshing gaps); mixing gaskets of different materials (e.g., replacing rubber gaskets with metal gaskets) is prohibited.
References:
Core Sources of Precautions for Installation of Nissan 12V 0.8KW Starter
- The content is integrated from the following four categories of authoritative and practical sources to ensure professionalism and feasibility:
I. Original Factory Core Technical Documents (Highest Authority Basis)
Nissan Original Factory Maintenance Manuals (e.g., model-specific volumes of Nissan Engine Repair Manual)
Specify precise torque parameters such as 45±5N·m for M10 fixing bolts and 12±2N·m for B+ terminal nuts, as well as model-adaptive parameters like the armature shaft axial gap of 0.15-0.5mm.
Define the starter positioning benchmark, wiring harness routing, and electromagnetic switch wiring specifications, serving as the core basis for installation accuracy and compatibility.
Technical Manuals of Starter Supporting Suppliers (e.g., Denso, Bosch)
Clarify the applicable models for 12V 0.8KW starters, terminal connection torque, and requirements for cleaning and sealing the mounting surface, which cross-verify with the content of original factory manuals.
II. Industry General Technical Specifications (Safety and Basic Standards)
General Maintenance Technical Standards for Automobiles/Forklifts
Such as Automotive Electrical Appliance Maintenance Specifications and Forklift Maintenance Safety Operation Procedures, which stipulate safety guidelines including disconnecting the negative battery terminal before installation, prohibiting striking the starter housing, and limiting single start-up tests to ≤5 seconds with intervals ≥10 seconds.
Vocational Education and Technical Textbooks
Such as Forklift Structure, Principle and Maintenance and Automotive Electrical Equipment Maintenance, which clarify practical key points like starter assembly gaps, lubrication points, and brush installation, providing theoretical support for installation accuracy.

