
Starter car parts 513R-3708950-02 PG260A 6100784 for Shenqi 513R
Applicable models: Shenqi 513R
Reference part number:513R-3708950-02 PG260A 6100784
| Power horsepower : | 12V 1.2KW |
| Number of feet : | 8T |
| Size : | 24*12*16single unit inner box |
| Weight : | Net weight 2.8KG |
| Packaging : | Neutral kraft paper packaging |
| Spot/Pre sale : | Spot goods |
| Warranty : | 1 year |
| Product number : |
| Type : | starter |
| Specification : | 12V 1.2KW |
| Number of feet : | 8T |
| Brand : | nuojin |
| Number : | 513R-3708950-02 PG260A 6100784 |
| Quality : | Remanufacture |
| Delivery time : | 10 day |





Installation Method for Shenqi (Suspected Model Confusion) 12V Starter
I. Pre-installation Preparation
Tool and Material Preparation
Special tools: Torque wrench (range 8–32N·m), 10/12/14mm socket wrench, Phillips screwdriver, wiring terminal crimping tool.
Consumables: Engine sealant, lock washers, flat washers, insulating tape, rust remover, cleaning cloths.
Protective equipment: Insulated gloves, safety goggles, to prevent electric shock and oil contamination.
Condition Inspection and Safety Operations
Disconnect the negative battery terminal: This is a core safety operation to prevent short circuits during installation that could burn the starter or wire harness.
Inspect the new starter: No cracks on the appearance, no damage on the gear meshing surface, no rust on the wiring terminals; manually rotate the gear to ensure smooth operation without jamming.
Clean the mounting surface: Remove oil stains, rust and residual old sealant from the engine flywheel housing to ensure a flat fitting surface; simultaneously inspect the flywheel ring gear—if tooth wear exceeds 1/3, replace the ring gear first.
Confirm the starter model: The 12V starter must be compatible with the DAM13R engine (original factory models are mostly QDJ1325, etc.) to avoid insufficient starting power caused by mismatched power.
II. Installation Steps
Positioning and Pre-installation
Orient the drive end of the starter toward the flywheel housing, align it with the 2 mounting holes, manually screw in the 2 mounting bolts (do not fully tighten), and adjust the starter position to ensure the meshing clearance between the gear and flywheel ring gear is 0.2–0.5mm (measurable with a feeler gauge).
If the flywheel housing is equipped with a locating pin, insert the pin first before pre-installing the bolts to ensure accurate mounting reference without deviation.
Tightening the Mounting Bolts
Adopt the diagonal cross-tightening principle and use a torque wrench to tighten the bolts to 22–28N·m (universal torque value for Changan Shenqi micro-trucks). Install lock washers; over-tightening is prohibited to prevent housing deformation or thread stripping.
Electrical Wiring Connection (12V System-Specific)
Main power cable connection: Fasten the terminal of the thick power cable from the positive battery terminal to the starter’s main terminal (M terminal). Install flat washers + spring washers, with a torque value of 8–12N·m to ensure a secure connection without loosening.
Control circuit connection: Fasten the terminal of the thin wire from the starter relay to the starter’s control terminal (S terminal). Tighten the nut until the terminal has no wobble; avoid excessive force to prevent damage to the terminal.
Wiring arrangement: Secure the wire harness to the reserved brackets on the engine with cable ties, keeping it away from high-temperature/moving components such as the exhaust pipe and fan to prevent harness abrasion or scorching.
Reconnecting the Battery
Connect the negative battery cable with a tightening torque of 10–15N·m, ensuring the terminal is clean and free of rust.
III. Post-installation Inspection and Testing
Mechanical Inspection
Rotate the starter gear to confirm smooth meshing with the flywheel ring gear, with no jamming or abnormal noise.
Check the clearance between the starter and adjacent components (e.g., oil pan, intake pipe)—ensure the clearance is ≥15mm with no interference.
Electrical Testing
Turn the ignition switch to the "Start" position and observe the starter operation: the gear should engage quickly, the engine should start smoothly without idling or slipping; release the switch after startup, and the gear must retract immediately.
Perform 3 short-time starting tests (each test ≤5 seconds, interval ≥10 seconds between tests) to confirm the starter operates without overheating or unusual odors. During startup, the 12V battery voltage must not drop below 9.5V.
Precautions for Installation of Shenqi (Presumed to Be Models Equipped with DAM13R Engine) 12V Starter
I. Safety and Compatibility Precautions Before Installation
Mandatory Power-off Operation
Precise Model Matching
Confirm that the starter has a rated voltage of 12V. Connecting a 12V starter to a 24V power system is strictly prohibited, otherwise the internal coil will be directly burned out.
The starter model must be compatible with the DAM13R engine (commonly used original factory models include QDJ1325). Its power should reach about 1.4kW to avoid insufficient starting power and gear meshing slip caused by low power.
Inspect the condition of the flywheel ring gear at the same time: if the tooth surface wear exceeds 1/3, or there are chipped teeth or cracks, the ring gear must be replaced first. Otherwise, it will accelerate the wear of the new starter gear and even cause meshing jamming.
Pre-inspection of Component Condition
Check the new starter for no cracks or deformation on the appearance, no rust on the wiring terminals, and the gear should rotate smoothly without jamming when turned manually. If the starter has been stored for more than 6 months, check the state of the internal lubricating grease; replenish special high-temperature lubricating grease if it is dry.
Thoroughly clean the mounting surface of the engine flywheel housing to remove oil stains, rust and residual old sealant. If the mounting surface is deformed, it must be corrected first, otherwise the starter will be installed askew, resulting in abnormal gear meshing clearance.
II. Operational Precautions During Installation
Specifications for Positioning and Fastening
Prioritize positioning via locating pins. For models without locating pins, manually pre-install 2 bolts and adjust the starter position to ensure the meshing clearance between the gear and flywheel ring gear is 0.2–0.5mm (measurable with a feeler gauge). Excessive clearance may cause slipping, while insufficient clearance may cause gear jamming.
Install lock washers on the mounting bolts, and adopt the diagonal cross-tightening principle. The torque value must be strictly controlled within the range of 22–28N·m. Over-tightening is prohibited to prevent starter housing deformation or thread stripping.
References:
Statement of Sources for Precautions for Installation of Shenqi 12V Starter
Explanation of Sources and Basis
- Core Basis
After-sales maintenance practices for Changan Shenqi micro-trucks (e.g., T20/T30) equipped with the DAM13R engine.
General installation procedures and torque/clearance parameters for starters, such as 22–28N·m for mounting bolts, 8–12N·m for main terminals, and a gear meshing clearance of 0.2–0.5mm.
Electrical connection specifications for 12V starters, including the definition of M/S terminals, mandatory power-off operation requirements, and wire harness spacing standards.
- Industry Standards and General SpecificationsThe content references universal industry requirements for the installation of automotive electrical equipment and starter disassembly/assembly, such as mandatory power-off operation, diagonal cross-tightening, prohibition of striking components, and control of starting duration and intervals, to ensure operational safety and reliability.
- Supplementary Practical ExperienceThe document incorporates key precautions and test verification procedures summarized from common issues encountered in frontline maintenance work, such as model mismatches, contaminated mounting surfaces, wire harness interference, and over-tightening, to facilitate on-site application.

